BLD98-03343
| BLD-Framing/Rough-in | 3/9/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | A | CANC |
|
|
###-####
Carl has scheduled to go this afternoon per contractor, thanks Carl !!!! 3/12/2001 12:30:20 PM
|
BLD01-00258
| BLD-Framing/Rough-in | 3/9/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 415 On 3/9/2001 2:22:54 PM
pressure treat has been put in around window wells 3/12/2001 10:58:05 AM
|
BLD00-01497
| BLD-Framing/Rough-in | 3/9/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | A | PASS |
|
|
###-####
ok to insulate 3/12/2001 10:51:45 AM
|
BLD01-00527
| BLD-Footing | 3/9/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | A | PART |
|
|
###-####
ok so far, wip 3/12/2001 11:28:59 AM
|
BLD01-00458
| BLD-Energy code compliance | 3/12/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | P | PASS |
|
|
MARK-- ###-#### ENERGY CODE
|
BLD99-01243
| BLD-Framing/Rough-in | 3/12/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | P | NR |
|
|
James watts ###-####
conference only on all parts of job for prospective buyer, all looked to be in fair shape, need new permits for all and inspections on trades and framing( less shear ) and so on. 3/12/2001 3:26:58 PM
|
BLD00-01497
| BLD-Framing/Rough-in | 3/12/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-01180
| BLD-Conference | 3/12/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | P | PASS |
|
|
###-####
handrails w/in the house 3/12/2001 12:16:04 PM
|
MEC01-00108
| Final | 3/12/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/12/2001 at 11:04:28. Contact: ###-####.
|
MEC01-00109
| Final | 3/12/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/12/2001 at 11:05:58. Contact: ###-####.
|