PLM01-03880
| Water and/or Sewer | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | PASS |
|
|
###-#### STEVE PLEASE CALL 1ST this was a r/i. 3/12/2002 5:10:29 PM
|
PLM02-00564
| Plumbing Rough-in | 3/12/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | FAIL |
|
|
###-#### ROB floor sink/ hub drain must be exposed in cabinet toe kick, new branch line is installed backwards. 3/12/2002 2:04:49 PM
|
PLM01-03880
| Plumbing Rough-in | 3/12/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 330 On 3/12/2002 5:10:04 PM
|