ELE01-03754
| Final | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 12:08:02. Contact: ###-####.
|
ELE01-00542
| Final | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | A | PASS |
|
|
JOHN ###-####
|
ELE01-00540
| Final | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | A | PASS |
|
|
JOHN ###-####
|
ELE00-04069
| Final | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | A | FAIL |
|
|
john ###-#### re-insp ground clamp 3/12/2002 11:56:40 AM
|
ELE01-03489
| Final | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 20:59:46. Contact: ###-####.corrections not made $42 fee due 3/12/2002 10:46:07 AM
|
ELE02-00396
| Electrical Rough-In | 3/12/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | PASS |
|
|
r/i ceiling insp-roger ###-####
|
ELE01-01629
| Final | 3/12/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | FAIL |
|
|
###-#### call first to meet there roof top receps and coax in with line voltage in poles 3/12/2002 4:28:55 PM
|
ELE00-04069
| Final | 3/12/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | PASS |
|
|
re-insp fn --###-#### john
|