BLD98-03705
| BLD-Footing | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 11:36:13. Contact: . int ftg/ pile caps. 3/12/2002 1:31:35 PM
|
BLD01-02553
| BLD-Framing/Rough-in | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | A | FAIL |
|
|
GREG ###-#### KEY IS UNDER ROCK BY THE BACK DOOR PLANS ARE ON KITCHEN COUNTER; nr, need elec, c/n issued, framing not complete (ramp? bsmt /crawl doors..etc. see c/n) 3/12/2002 10:28:14 AM
|
BLD00-03538
| BLD-Conference | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | A | PASS |
|
|
###-#### MEL
|
BLD01-03156
| BLD-Foundation | 3/12/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | PART |
|
|
found rob- ###-#### , masonry cols, bsmt col ftgs ok 3/12/2002 2:35:06 PM
|
BLD02-00472
| BLD-Framing/Rough-in | 3/12/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | NR |
|
|
###-#### BARRETT conf only w/ owner-bldr...kitch remodel. 3/12/2002 2:35:45 PM
|
BLD02-00383
| BLD-Framing/Rough-in | 3/12/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | PASS |
|
|
fr insp- dave- ###-#### ok to cover 3/12/2002 2:58:30 PM
|
BLD01-01635
| BLD-Conference | 3/12/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | PASS |
|
|
for conf- tom ###-####; re final; draft stop is installed over furnace room, ok to cover. 3/12/2002 6:39:19 PM
|
BLD02-00035
| BLD-Framing/Rough-in | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | NR |
|
|
|