BLD01-02195
| BLD-Final | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 16:26:51. Contact: ###-####.
|
BLD01-03183
| BLD-Energy code compliance | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 18:05:57. Contact: ###-####. Posted a c/n for a abs plumbing vent in the exterior wall of the 2nd floor bathroom, it has been caped and never got reconnected. 3/12/2002 10:28:59 AM
|
BLD01-01276
| BLD-Final | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 19:21:41. Contact: ###-####.c/n posted. 3/12/2002 10:51:08 AM
|
BLD02-00198
| BLD-Final | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | A | NR |
|
|
###-#### dennis No plans at the site. 3/12/2002 12:03:02 PM
|
MEC02-00501
| Pressure Test | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 14:19:35. Contact: ###-####.---for gas line to dryer
|
BLD01-03269
| BLD-Framing/Rough-in | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | NR |
|
|
shear---kim ###-#### Will recall .talked with contractor. 3/12/2002 3:26:59 PM
|
MEC02-00697
| Pressure Test | 3/11/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | CANC |
|
|
STEVE ###-####
|
BLD00-03207
| BLD-Footing | 3/12/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 06:50:54. Contact: ###-####. steel not in place. no one at site. 3/12/2002 3:45:48 PM
|
BLD01-02817
| BLD-Energy code compliance | 3/12/2002 | 3/12/2002 | 3/12/2002 12:00:00 AM | P | NR |
|
|
###-#### JOHN. Needs to complete the foam and seal at the ele boxes,also vapor barier at walls.Home owner aqsked if they could sheet rock the garage, Garage ok to sheet rock. 3/12/2002 2:40:50 PM
|