Inspections for the day of: Wednesday, March 12, 2003.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRon Ginner
TitlePLM-INSPECTOR
Phone #794-9485
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM03-00595 Groundwork3/11/20033/12/20033/12/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 3/11/2003 at 1:13:21 PM. Contact: ###-####. shell and core, floor drain and vent to be added later and will require a TEST. outside sewer to done later also. no water at this time. 3/12/2003 9:43:40 AM 3/12/2003 9:45:23 AM
PLM03-00600 Groundwork3/11/20033/12/20033/12/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 3/11/2003 at 1:18:11 PM. Contact: ###-####. shell and core, floor drain and vent will be tested later and out side sewer will be added later. no water at this time. 3/12/2003 9:45:05 AM
PLM03-00604 Plumbing Rough-in3/11/20033/12/20033/12/2003 12:00:00 AMAPASS
###-#### debbie
PLM03-00604 Plumbing Rough-in3/11/20033/12/20033/12/2003 12:00:00 AMAPASS
###-#### debbie
PLM03-00608 Sprinkler (Final)3/11/20033/12/20033/12/2003 12:00:00 AMAPASS
###-####
PLM02-00093 Final3/11/20033/12/20033/12/2003 12:00:00 AMAPASS
###-#### call first
PLM02-03644 Final3/12/20033/12/20033/12/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 3/12/2003 at 6:53:40 AM. Contact: ###-####.
PLM03-00599 Plumbing Rough-in3/12/20033/12/20033/12/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/12/2003 at 8:23:03 AM. Contact: ###-####.
PLM03-00235 Final3/12/20033/12/20033/12/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 3/12/2003 at 8:27:27 AM. Contact: ###-####. T AND P drain needs to be run down to 6-24 inches from ground. two cleanout covers missing, two strainers missing for shower and floor drain. 3/12/2003 2:26:25 PM
PLM03-00607 Sprinkler (Final)3/12/20033/12/20033/12/2003 12:00:00 AMPPART
jan; Phone #: ###-#### Internet Inspection Request from: Darla Downs okay to bury tie in, backflow not tested yet. 3/12/2003 1:58:22 PM
PLM03-00308 Plumbing Rough-in3/12/20033/12/20033/12/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 3/12/2003 at 10:08:03 AM. Contact: ###-####. north third of building is ground worked now. 3/12/2003 2:42:03 PM
PLM03-00574 Storm Drains3/11/20033/12/20033/12/2003 12:00:00 AMPPASS
###-#### north side of building to pond on east side only. 3/12/2003 1:35:06 PM