PLM07-00697
| Sprinkler (Final) | 3/12/2007 | 3/12/2007 | 3/13/2007 9:47:50 AM | P | PART |
|
|
george; Phone #: ###-#### Internet Inspection Request from: Victoria Beall-rp needs to be 12" above grade, slope back to drain down valve.
|
PLM07-00696
| Sprinkler (Final) | 3/12/2007 | 3/12/2007 | 3/13/2007 9:46:15 AM | P | PART |
|
|
george; Phone #: ###-#### Internet Inspection Request from: Victoria Beall-rp needs to be 12" above grade, slope back to drain down valve.
|
PLM06-03057
| Plumbing Rough-in | 3/9/2007 | 3/12/2007 | 3/13/2007 9:44:32 AM | P | PART |
|
|
Please inspect rough-in on all 3 floors of A-wing. Thanks! Phone #: ###-####-a-wing pass, still need to inspect b-wing.
|
PLM05-03585
| Final | 3/8/2007 | 3/12/2007 | 3/12/2007 11:16:31 AM | A | PASS |
|
|
Job # 2345, Added a Double Check Valve Phone #: ###-####
|
PLM07-00691
| Water and/or Sewer | 3/9/2007 | 3/12/2007 | 3/12/2007 11:06:29 AM | A | PASS |
|
|
Ryan pls call prior to inspection; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
PLM05-03585
| DOC - Permit Finaled | 3/12/2007 | 3/12/2007 | 3/12/2007 11:06:16 AM | P | PASS |
|
|
|
PLM07-00641
| Plumbing Rough-in | 3/9/2007 | 3/12/2007 | 3/12/2007 10:46:26 AM | A | PART |
|
|
Phone #: ###-####-ok to cover top side, need to step up building drain to handle 4 toilets. will check on final.
|
PLM07-00527
| Plumbing Rough-in | 3/9/2007 | 3/12/2007 | 3/12/2007 9:47:22 AM | A | PART |
|
|
Phone #: ###-####-left side unit dwv test failed.
|
PLM07-00051
| Final | 3/12/2007 | 3/12/2007 | 3/12/2007 9:05:49 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/12/2007 at 6:21:52 AM. Contact: ###-####.
|
PLM07-00052
| Final | 3/12/2007 | 3/12/2007 | 3/12/2007 9:05:30 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/12/2007 at 6:22:47 AM. Contact: ###-####.
|