BLD07-03255
| BLD-Foundation | 3/12/2008 | 3/12/2008 | 3/12/2008 5:10:06 PM | P | PASS |
|
|
clay Phone #: ###-####
|
BLD06-02758
| BLD-Conference | 3/12/2008 | 3/12/2008 | 3/12/2008 4:20:04 PM | P | PASS |
|
|
greg - around 4:00 pm Phone #: ###-####
|
BLD07-02653
| BLD-Footing | 3/12/2008 | 3/12/2008 | 3/12/2008 4:10:08 PM | P | CANC |
|
|
tim Phone #: ###-####
|
BLD07-01188
| BLD-Final | 3/12/2008 | 3/12/2008 | 3/12/2008 4:04:25 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 3/12/2008 at 8:40:13 AM.
|
BLD07-02405
| BLD-Framing/Rough-in | 3/11/2008 | 3/12/2008 | 3/12/2008 11:15:06 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/11/2008 at 2:00:58 PM. Contact: ###-####. first floor framing ok/ bolts and mlb king stud to header/ strap top plates for continous aplaction. fire wall gyp being instaled as per accepted joint aplacation at joist locations in p/l walls and encloser walls back of elvator.
|
BLD08-00338
| BLD-Foundation | 3/11/2008 | 3/12/2008 | 3/12/2008 9:50:32 AM | A | PASS |
|
|
will Phone #: ###-####
|
BLD08-00338
| BLD-Footing | 3/11/2008 | 3/12/2008 | 3/12/2008 9:50:12 AM | A | PASS |
|
|
will Phone #: ###-####
|
BLD07-03193
| BLD-Conference | 3/11/2008 | 3/12/2008 | 3/12/2008 9:14:15 AM | A | PASS |
|
|
keil Phone #: ###-####
|
BLD06-01419
| BLD - Request for Extension | 3/11/2008 | 3/12/2008 | 3/12/2008 8:18:56 AM | | PASS |
|
|
Owner now acting as own GC and wants to continue with project//James ###-####
|