Inspections for the day of: Wednesday, March 12, 2008.
Number of inspections: 15
Percentage of inspections complete: 93 %
Percentage of inspections not complete: 7 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00025 INSP-Sprinkler Rough-in3/11/20083/12/20083/12/2008 4:45:03 PMPPART
See locations on approved plan set marked okay for cover at the lobby and elevator vestibules.
BLD06-03526 FIRE-Final Inspection3/11/20083/12/20083/12/2008 4:31:14 PMPPASS
Final fire life safety inspection completed acceptable.
BLD06-03521 FIRE-Final Inspection3/11/20083/12/20083/12/2008 4:30:28 PMPPASS
Noted correction items verified for completion, fire life safety finaled.
BLD06-03520 FIRE-Final Inspection3/11/20083/12/20083/12/2008 4:29:26 PMPPASS
Corrections are complete, fire life safety passed.
BLD06-03305 FIRE-Final Inspection3/11/20083/12/20083/12/2008 4:28:41 PMPPASS
Fire life safety inspection passed.
FIR07-00324 INSP-Final Inspection3/12/20083/12/20083/12/2008 4:27:44 PMPPASS
Fire alarm permit finaled.
BLD06-00077 FIRE-Final Inspection3/12/20083/12/20083/12/2008 4:00:20 PMPNR
Need project fire sprinkler and alarm permits finaled prior to building life safety final.
BLD06-00076 FIRE-Final Inspection3/12/20083/12/20083/12/2008 3:58:28 PMPNR
Pending alarm and sprinkler finals.
FIR07-01043 INSP-Final Inspection3/10/20083/12/20083/12/2008 3:55:42 PMAFAIL
Descriptor for the new manual pull station is not accurate, need to provide an updated map at the panel reflecting correct floorplan and device locations, duct detectors could not be tested due to locked thermostat controls for the HVAC units, lock at the panel breaker installed while on site, one overspaced notification device repositioned while on site, 95cd ceiling mounted appliances not to exceed spacing guidelines, recommend lower decible settings at the restrooms due to sound pressure levels near 110 dBA at the minimum hearing distance, EOL voltage not tested at this time.
BLD07-03089 FIRE-Final Inspection3/11/20083/12/20083/12/2008 11:04:07 AMPFAIL
Missing signage at the terrace doors, exterior EM light did not function, not ready for final at this time.
FIR08-00160 INSP-Sprinkler Rough-in/Hydro3/12/20083/12/20083/12/2008 11:01:44 AMAPART
Sprinkler system modifications are approved for ceiling cover at locations annotated and initialed with todays date on stamped plan set.
FIR08-00079 INSP-Final Inspection3/11/20083/12/20083/12/2008 10:29:28 AMAPASS
Tie-in completed, tags and signage added while on site, fire sprinkler work approved for final.
FIR08-00078 INSP-Final Inspection3/11/20083/12/20083/12/2008 10:26:38 AMAPASS
Fire sprinkler passed final inspection, permit finaled.
FIR08-00128 INSP-Final Inspection3/11/20083/12/20083/12/2008 10:24:09 AMAPASS
Fire alarm system modifications passed field testing, permit finaled.
BLD05-02158 FIRE-Final Inspection3/11/20083/12/2008 A