BLD08-02370
| BLD-Aging Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 4:35:13 PM | P | DEFR |
|
|
Need project related FIR permit finals prior to building life safety approvals.
|
FIR08-00809
| FIR-Aging Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 4:34:06 PM | | NR |
|
|
Pending site inspection request.
|
FIR07-01051
| INSP-Sprinkler Rough-in | 3/12/2009 | 3/12/2009 | 3/12/2009 4:32:23 PM | P | PART |
|
|
|
FIR08-00018
| INSP-Sprinkler Rough-in/Hydro | 3/10/2009 | 3/12/2009 | 3/12/2009 4:31:27 PM | P | PART |
|
|
See approved plan annotations for adjustments to be made (15th and 16th floors).
|
BLD08-02487
| FIRE-Final Inspection | 3/11/2009 | 3/12/2009 | 3/12/2009 4:30:25 PM | P | PASS |
|
|
Fire life safety inspection passed per activity notes 2/26, verified with contractor inspection record has been signed.
|
BLD08-02302
| FIRE-Conference | 3/12/2009 | 3/12/2009 | 3/12/2009 4:29:09 PM | P | DONE |
|
|
On site conference with the owner regarding fire code review notes and plan annotations for fire life safety issues. Identified items #3,7 and 8 in need of attention.
|
FIR08-00863
| INSP-Supply line flush | 3/12/2009 | 3/12/2009 | 3/12/2009 4:26:29 PM | P | PART |
|
|
Forward flow testing of the backflow preventer completed satisfactory.
|
FIR08-00018
| INSP-Sprinkler Rough-in/Hydro | 3/11/2009 | 3/12/2009 | 3/12/2009 4:25:01 PM | A | FAIL |
|
|
See red line annotations on plans for corrections to be made at the 15th and 16th floors including spacing, surge restraints and obstructions.
|