BLD08-00178
| FIRE-Final Inspection | 3/11/2009 | 3/12/2009 | 3/12/2009 4:03:43 PM | A | FAIL |
|
|
The project related fire alarm permit needs to be finaled and the address addressed
|
FIR09-00160
| INSP-Sprinkler Rough-in/Hydro | 3/11/2009 | 3/12/2009 | 3/12/2009 3:36:15 PM | P | PASS |
|
|
The underground supply piping is ok to cover.
|
FIR09-00159
| INSP-Sprinkler Rough-in | 3/11/2009 | 3/12/2009 | 3/12/2009 3:35:19 PM | P | PASS |
|
|
The underground supply piping is ok to cover.
|
FIR08-00716
| INSP-Final Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 3:06:20 PM | P | FAIL |
|
|
Provide an updated map at the facp and the releasing panel, provide another isolating module in the new building for lightning protection and modify the system so that the central station recieves supervisory signals instead of trouble signals on zone 32.
|
BLD08-01275
| FIRE-Final Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 3:02:09 PM | P | PASS |
|
|
life safety passed
|
FIR08-00701
| INSP-Final Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 2:53:10 PM | P | PASS |
|
|
permit finaled
|
FIR08-00627
| INSP-Final Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 2:52:41 PM | P | PASS |
|
|
Permit finaled
|
FIR09-00161
| INSP-Sprinkler Rough-in/Hydro | 3/11/2009 | 3/12/2009 | 3/12/2009 8:37:43 AM | A | PASS |
|
|
The sprinkler piping in the front area of the tenant space can be covered.
|