ESC08-00810
| INSP - Stop Work Order | 3/12/2009 | 3/12/2009 | 3/12/2009 4:02:29 PM | P | FAIL |
|
|
Started work without a permit. Left a message for Mark Bowen explaining the violation.
|
ESC09-00081
| Site Preparation | 3/12/2009 | 3/12/2009 | 3/12/2009 3:07:24 PM | | PASS |
|
|
Drain is protected. Site looks good.
|
ESC09-00073
| Site Preparation | 3/12/2009 | 3/12/2009 | 3/12/2009 2:49:27 PM | P | FAIL |
|
|
Verbal correction message to RP: Due to confined space we will allow them to washout in the footing trench this time only. Prior to pour of garage they will need to provide a washout pit. Also need to protect stock pile at front of project by 3/13/09 PM. Will re-inspect on 3/16/09 AM.
|
ESC09-00078
| Site Preparation | 3/12/2009 | 3/12/2009 | 3/12/2009 1:56:15 PM | | PASS |
|
|
|
ESC09-00050
| Site Preparation | 3/12/2009 | 3/12/2009 | 3/12/2009 1:42:06 PM | P | PASS |
|
|
ESC sign posted and went over with the RP over the requirements for his project to stay compliant.
|
ESC09-00050
| INSP - Stop Work Order | 3/12/2009 | 3/12/2009 | 3/12/2009 1:41:18 PM | P | PASS |
|
|
Permit was aquired by the developer from the city and ESC sign has been posted.
|
ESC08-00952
| BMP Violation | 3/11/2009 | 3/12/2009 | 3/12/2009 11:04:12 AM | A | DONE |
|
|
duplicate
|
ESC08-00750
| General Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 11:03:10 AM | A | FAIL |
|
|
Verbal to GC since RP is out of town: Need to clean up all hard surface of all sediment and debris. Clean up all trash debris on site and properly dispose of. Will re-inspect on 3/16/09 AM.
|
ESC08-00763
| General Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 11:02:44 AM | A | FAIL |
|
|
Verbal to GC since RP is out of town: Need to clean up all hard surface of all sediment and debris. Clean up all trash debris on site and properly dispose of. Will re-inspect on 3/16/09 AM.
|
ESC08-00736
| Complaint Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 10:58:55 AM | A | FAIL |
|
|
Correction Notice To RP: 1. Clean up all hardsurfaces of all sediment and debris. 2. Provide a washout pit of futere washout needs. 3. Provide a trash debris container for all trash debris on site. Also clean up all trash debris on site and properly dispose of. Failure to comply will result inn a stop work order. Will re-inspect on 3/16/09 AM.
|
ESC08-00749
| General Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 10:56:01 AM | A | CANC |
|
|
Wrong permit number
|
ESC03-00990
| Site Final | 3/12/2009 | 3/12/2009 | 3/12/2009 10:21:04 AM | A | PASS |
|
|
|
ESC08-00952
| General Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 9:15:33 AM | A | DONE |
|
|
Found no residual of a petroleum with in the project area.
Notified ACHD over the residual of the petroleum remaining in the road way and also next the storm drain to the East, on the Overland / Cortell intersection. I was told that they will notify the contractor to do further clean up. Will be re-inspected by Tom Dillian with ACHD for compliance of the clean up. I will have no further actions pertaining with the spill since it is in the the ACHD right-away.
CAS #460
|