Inspections for the day of: Friday, March 12, 2010.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-00380 FIRE-Final Inspection3/12/20103/12/20103/12/2010 4:54:53 PMPFAIL
This building is equipped with a manual and automatic fire alarm system- need to provide a current inspection report for verification of system functionality. Also noted non-compliant door hardware at the warehouse side. The provided floorplans do not indicate a mezzanine which appears to have been installed after the building was constructed. Need to verify occupancy use at the warehouse area.
BLD10-00105 FIRE-Final Inspection3/11/20103/12/20103/12/2010 4:40:02 PMPPASS
Fire life safety passed inspection.
BLD10-00106 FIRE-Final Inspection3/11/20103/12/20103/12/2010 4:39:26 PMPPASS
Fire life safety inspection completed satisfactory, corrections made while on site okayed.
FIR03-00233 INSP-Final Inspection3/12/20103/12/20103/12/2010 4:37:51 PMPPASS
Site verified sprinkler riser is monitored by the fire alarm system during an inspection for wireless radio transmission work done by Allied General. Aging fire sprinkler permit final okayed.
FIR06-00586 INSP-Final Inspection3/12/20103/12/20103/12/2010 4:22:49 PMAPASS
Okayed for permit final per inspection completed 8/16/06 by T. Cobbley- see activity notes.
FIR07-00760 INSP-Final Inspection3/12/20103/12/20103/12/2010 4:19:05 PMAPASS
Fire sprinkler permit work completed acceptable, final inspection passed.
BLD09-01251 FIRE-Conference3/12/20103/12/20103/12/2010 4:15:23 PMADONE
Regarding project completion and related open fire alarm permit. Also discussed pending fire alarm upgrade work with the operations manager on site.