BLD09-00557
| FIRE-Conference | 3/12/2010 | 3/12/2010 | 3/12/2010 4:54:11 PM | P | DONE |
|
|
Tom, building inspector, and I spoke to Herd about fire blocking and fire sprinkler requirements at the two fireplace locations and the columns. Also the the entire south third of the building has been covered with out the sprinkler piping having been inspected. I notified Herd of IFC requirements but stated that for this one specific happening I would not require the ceiling to be removed but the insulation would be required to be removed from over the piping for an inspection. The insulation will then need to be reinstalled for a secondary inspection. Any areas that I deam accessible will have the ceilings removed for sprinkler piping inspection. I notified Scott of the situation.
|
FIR09-00711
| INSP-Conference | 3/12/2010 | 3/12/2010 | 3/12/2010 4:48:49 PM | P | DONE |
|
|
I spoke to Matt about duct smoke detector placement and possible manometer testing to verify correct function of the detectors.
|
BLD09-00379
| FIRE-Final Inspection | 3/12/2010 | 3/12/2010 | 3/12/2010 3:31:08 PM | P | PASS |
|
|
Life safety passed.
|
BLD09-00981
| FIRE-Final Inspection | 3/11/2010 | 3/12/2010 | 3/12/2010 3:28:52 PM | P | FAIL |
|
|
Provide occupant load sign and approved single action hardware on the south exit gate. Per Paul the exit gates shown on the plans at the north end of the wall will not be installed. Per the plan reviewer resubmitted plans are not required.
|
FIR10-00062
| INSP-Sprinkler Rough-in | 3/11/2010 | 3/12/2010 | 3/12/2010 11:26:47 AM | A | PASS |
|
|
The sprinkler piping can be covered.
|
BLD10-00431
| FIRE-Final Inspection | 3/11/2010 | 3/12/2010 | 3/12/2010 12:00:00 AM | A | CANC |
|
|
jim Phone #: ###-####
|