BLD11-02932
| FIRE-Sprinkler Rough-in | 3/12/2012 | 3/12/2012 | 3/12/2012 5:52:33 PM | A | PART |
|
|
Painted upright sprinklers to be replaced prior to final as discussed.
|
FIR11-00573
| FIR-Aging Inspection | 3/12/2012 | 3/12/2012 | 3/12/2012 5:49:35 PM | P | DONE |
|
|
Need request for permit final when finished.
|
BLD11-02992
| FIRE-Final Inspection | 3/12/2012 | 3/12/2012 | 3/12/2012 5:47:24 PM | P | NR |
|
|
|
FIR12-00030
| INSP-Sprinkler Rough-in/Hydro | 3/12/2012 | 3/12/2012 | 3/12/2012 5:47:08 PM | P | PART |
|
|
Install missing coverage at the small entry vestibule adjoining two rooms per plan as discussed.
|
FIR12-00117
| INSP-Final Inspection | 3/12/2012 | 3/12/2012 | 3/12/2012 12:10:46 PM | A | NR |
|
|
Final inspection scheduled 3/13 AM
|
FIR09-00059
| FIR-Aging Inspection | 3/12/2012 | 3/12/2012 | 3/12/2012 12:09:43 PM | | DONE |
|
|
Conversation with alarm contractor regarding status of permit work.
|
BLD11-01983
| FIRE-Conference | 3/12/2012 | 3/12/2012 | 3/12/2012 12:05:38 PM | A | DONE |
|
|
Site work in progress
|
BLD12-00137
| FIRE-Alarm Testing | 3/12/2012 | 3/12/2012 | 3/12/2012 12:04:42 PM | A | PART |
|
|
Project related fire alarm modifications passed field test.
|