Inspections for the day of: Wednesday, March 12, 2014.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-02577 BLD-Final3/11/20143/12/20143/12/2014 4:42:35 PMPDEFR
bill Phone #: ###-#### out of time
BLD14-00555 BLD-Final3/11/20143/12/20143/12/2014 4:22:53 PMPPASS
call 1/2 hr before to meet for access // Lawrence Phone #: ###-#### no card on site final ok
BLD13-03147 BLD-Final3/11/20143/12/20143/12/2014 3:59:44 PMPFAIL
kristen Phone #: ###-#### saftey glass with in 24 inches of door.
BLD14-00500 BLD-Conference3/12/20143/12/20143/12/2014 3:38:24 PMPDONE
All work besides floor covering was conducted at exteiror please call 30 minutes before inspection if interior access is needed or if you would like a person present durring the inspection. Thanks Jesse Phone #: ###-#### >> Inspection requested via web by Jesse Adame
BLD14-00500 DOC - Permit Finaled3/12/20143/12/20143/12/2014 3:38:00 PMPPASS
BLD13-01556 BLD-Energy code compliance3/12/20143/12/20143/12/2014 3:27:45 PMPPASS
Justin Phone #: ###-####
BLD14-00412 BLD-Final3/12/20143/12/20143/12/2014 3:08:26 PMPPASS
BLD14-00320 BLD-Final3/12/20143/12/20143/12/2014 3:07:55 PMPPASS
BLD14-00411 BLD-Final3/12/20143/12/20143/12/2014 3:07:25 PMPPASS
BLD14-00320 BLD-Final3/10/20143/12/20143/12/2014 3:06:59 PMPPASS
Evan-Please call at least 30 mins in advance Phone #: ###-####
BLD14-00412 BLD-Final3/12/20143/12/20143/12/2014 3:06:31 PMPPASS
BLD14-00475 BLD-Footing3/12/20143/12/20143/12/2014 2:44:35 PMPPASS
Please call 30min ahead for access - Admir Phone #: ###-####
BLD13-00180 BLD-Footing3/12/20143/12/20143/12/2014 2:12:16 PMPPASS
pouring at 3 - jc Phone #: ###-#### ele conduit ok to cover as well as pad ft.
BLD14-00377 BLD-Conference3/11/20143/12/20143/12/2014 1:13:50 PMPPASS
Inspection request for 1:00pm to inspect the structural rebar for spread footings along grid lines 7 and 8 and columns along grid line 13. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin
BLD13-00938 BLD-Other3/11/20143/12/20143/12/2014 12:38:29 PMAFAIL
late AM// cover insp for apartment lobby / Jim Phone #: ###-#### oversized pvc penatration/ mail box area shaft required/ 1 ht protection of wood floor support/ west window gyp at ceilling line 1 hr protection behind metal framing.
BLD13-00767 BLD-Final3/10/20143/12/20143/12/2014 10:30:00 AMADONE
Raj Phone #: ###-#### 316
BLD13-02924 BLD-Energy code compliance3/11/20143/12/20143/12/2014 10:17:19 AMAPASS
Brett Phone #: ###-####
BLD13-02011 BLD-Framing/Rough-in3/11/20143/12/20143/12/2014 9:53:31 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD13-02244 BLD-Energy code compliance3/11/20143/12/20143/12/2014 9:31:41 AMAPASS
craig Phone #: ###-####