BLD13-02577
| BLD-Final | 3/11/2014 | 3/12/2014 | 3/12/2014 4:42:35 PM | P | DEFR |
|
|
bill Phone #: ###-#### out of time
|
BLD14-00555
| BLD-Final | 3/11/2014 | 3/12/2014 | 3/12/2014 4:22:53 PM | P | PASS |
|
|
call 1/2 hr before to meet for access // Lawrence Phone #: ###-#### no card on site final ok
|
BLD13-03147
| BLD-Final | 3/11/2014 | 3/12/2014 | 3/12/2014 3:59:44 PM | P | FAIL |
|
|
kristen Phone #: ###-#### saftey glass with in 24 inches of door.
|
BLD14-00500
| BLD-Conference | 3/12/2014 | 3/12/2014 | 3/12/2014 3:38:24 PM | P | DONE |
|
|
All work besides floor covering was conducted at exteiror please call 30 minutes before inspection if interior access is needed or if you would like a person present durring the inspection. Thanks Jesse Phone #: ###-#### >> Inspection requested via web by Jesse Adame
|
BLD14-00500
| DOC - Permit Finaled | 3/12/2014 | 3/12/2014 | 3/12/2014 3:38:00 PM | P | PASS |
|
|
|
BLD13-01556
| BLD-Energy code compliance | 3/12/2014 | 3/12/2014 | 3/12/2014 3:27:45 PM | P | PASS |
|
|
Justin Phone #: ###-####
|
BLD14-00412
| BLD-Final | 3/12/2014 | 3/12/2014 | 3/12/2014 3:08:26 PM | P | PASS |
|
|
|
BLD14-00320
| BLD-Final | 3/12/2014 | 3/12/2014 | 3/12/2014 3:07:55 PM | P | PASS |
|
|
|
BLD14-00411
| BLD-Final | 3/12/2014 | 3/12/2014 | 3/12/2014 3:07:25 PM | P | PASS |
|
|
|
BLD14-00320
| BLD-Final | 3/10/2014 | 3/12/2014 | 3/12/2014 3:06:59 PM | P | PASS |
|
|
Evan-Please call at least 30 mins in advance Phone #: ###-####
|
BLD14-00412
| BLD-Final | 3/12/2014 | 3/12/2014 | 3/12/2014 3:06:31 PM | P | PASS |
|
|
|
BLD14-00475
| BLD-Footing | 3/12/2014 | 3/12/2014 | 3/12/2014 2:44:35 PM | P | PASS |
|
|
Please call 30min ahead for access - Admir Phone #: ###-####
|
BLD13-00180
| BLD-Footing | 3/12/2014 | 3/12/2014 | 3/12/2014 2:12:16 PM | P | PASS |
|
|
pouring at 3 - jc Phone #: ###-#### ele conduit ok to cover as well as pad ft.
|
BLD14-00377
| BLD-Conference | 3/11/2014 | 3/12/2014 | 3/12/2014 1:13:50 PM | P | PASS |
|
|
Inspection request for 1:00pm to inspect the structural rebar for spread footings along grid lines 7 and 8 and columns along grid line 13. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin
|
BLD13-00938
| BLD-Other | 3/11/2014 | 3/12/2014 | 3/12/2014 12:38:29 PM | A | FAIL |
|
|
late AM// cover insp for apartment lobby / Jim Phone #: ###-#### oversized pvc penatration/ mail box area shaft required/ 1 ht protection of wood floor support/ west window gyp at ceilling line 1 hr protection behind metal framing.
|
BLD13-00767
| BLD-Final | 3/10/2014 | 3/12/2014 | 3/12/2014 10:30:00 AM | A | DONE |
|
|
Raj Phone #: ###-#### 316
|
BLD13-02924
| BLD-Energy code compliance | 3/11/2014 | 3/12/2014 | 3/12/2014 10:17:19 AM | A | PASS |
|
|
Brett Phone #: ###-####
|
BLD13-02011
| BLD-Framing/Rough-in | 3/11/2014 | 3/12/2014 | 3/12/2014 9:53:31 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD13-02244
| BLD-Energy code compliance | 3/11/2014 | 3/12/2014 | 3/12/2014 9:31:41 AM | A | PASS |
|
|
craig Phone #: ###-####
|