BLD13-03123
| FIRE-Conference | 3/12/2014 | 3/12/2014 | 3/12/2014 4:31:22 PM | P | DONE |
|
|
On site conference regarding fire life safety inspection items. Noted adjustments to exit sign and fire extinguisher locations.
|
BLD13-03468
| FIRE-Final Inspection | 3/12/2014 | 3/12/2014 | 3/12/2014 3:22:58 PM | P | PASS |
|
|
Life safety inspection completed satisfactory. Prior inspection items finished.
|
BLD14-00412
| FIRE-Final Inspection | 3/12/2014 | 3/12/2014 | 3/12/2014 3:18:25 PM | P | PASS |
|
|
Life safety inspection passed.
|
BLD14-00411
| FIRE-Final Inspection | 3/12/2014 | 3/12/2014 | 3/12/2014 3:16:42 PM | P | PASS |
|
|
Life safety finaled.
|
BLD14-00320
| FIRE-Final Inspection | 3/10/2014 | 3/12/2014 | 3/12/2014 3:14:59 PM | P | PASS |
|
|
Life safety passed provided the fire extinguisher is updated with a current service tag.
|
BLD14-00411
| FIRE-Final Inspection | 3/12/2014 | 3/12/2014 | 3/12/2014 3:10:54 PM | P | PASS |
|
|
Life safety passed.
|
FIR14-00116
| INSP-Sprinkler Rough-in/Hydro | 3/12/2014 | 3/12/2014 | 3/12/2014 2:05:31 PM | P | PART |
|
|
UG fire supply line passed hydrostatic testing.
|
FIR13-00670
| INSP-Sprinkler Rough-in | 3/11/2014 | 3/12/2014 | 3/12/2014 11:48:17 AM | A | PART |
|
|
Overhead rough-in passed. Okay for cover at the grid and sheetrock ceilings. Adjustments to upright coverage due to ductwork obstructions approved.
|