BLD15-00221
| BLD-Wall Bracing | 3/12/2015 | 3/12/2015 | 3/12/2015 5:34:44 PM | P | PASS |
|
|
Contact person on site will be Jacob Phone #: ###-#### Inspection requested via web by T.J. Sayers
|
BLD14-03259
| BLD-Conference | 3/12/2015 | 3/12/2015 | 3/12/2015 5:33:10 PM | P | PART |
|
|
Framing inspection prior to cover. Enter through rear door (lockbox code 8059) Phone #: ###-#### Inspection requested via web by Brandon Juarez North 3rd of phased project .........framing OK.
|
BLD15-00178
| BLD-Final | 3/12/2015 | 3/12/2015 | 3/12/2015 2:35:16 PM | P | PASS |
|
|
Curtis Phone #: ###-#### OK for Perm Occ.
|
BLD14-03632
| BLD-Ceiling Grid Inspection | 3/11/2015 | 3/12/2015 | 3/12/2015 2:04:29 PM | P | PASS |
|
|
David Phone #: ###-####
|
BLD15-00433
| BLD-Foundation | 3/11/2015 | 3/12/2015 | 3/12/2015 12:42:55 PM | A | PASS |
|
|
Tim Phone #: ###-####
|
BLD15-00178
| BLD-Framing/Rough-in | 3/11/2015 | 3/12/2015 | 3/12/2015 12:38:35 PM | A | PASS |
|
|
Curtis Phone #: ###-####
|
BLD14-01408
| BLD-Wall Bracing | 3/11/2015 | 3/12/2015 | 3/12/2015 12:32:30 PM | A | PASS |
|
|
Tyler// inspection for interior sheer Phone #: ###-####
|
MIS15-00053
| BLD-Conference | 3/11/2015 | 3/12/2015 | 3/12/2015 10:38:36 AM | A | DONE |
|
|
Shed stop work Contr said ....talked to zoning.....zoning OK with size and setbacks.
|
MIS15-00053
| DOC - Permit Finaled | 3/12/2015 | 3/12/2015 | 3/12/2015 10:37:19 AM | P | PASS |
|
|
|
MIS15-00053
| DOC - Permit Finaled | 3/12/2015 | 3/12/2015 | 3/12/2015 10:36:46 AM | P | PASS |
|
|
|
GCB14-00099
| GCB-Courtesy | 3/11/2015 | 3/12/2015 | 3/12/2015 9:23:53 AM | A | DONE |
|
|
Gary ###-#### - conference requested w/Jim Sly Corr Notice......Maintain 2 ;layers each side 2 hr walls 5/8 type x gyp. without wood penitrations per approved plan.
|