Inspections for the day of: Thursday, March 12, 2015.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-00017 BLD-Final3/11/20153/12/20153/18/2015 8:10:25 AMAPASS
Call if he needs to be there // Pete Phone #: ###-####
BLD14-01937 BLD-Energy code compliance3/12/20153/12/20153/13/2015 6:40:50 AMPPASS
Area 2 lvl 3 insulation. Shower pan fire caulk area 2 lvl 4. Area 2 lvl 4 corridor insulation. South west stair wall framing area 2 lvl 4. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD13-03405 BLD-Energy code compliance3/11/20153/12/20153/13/2015 6:38:26 AMPPASS
5th floor tower 3 Phone #: ###-#### Inspection requested via web by Tim Toups
BLD14-02190 BLD-Energy code compliance3/11/20153/12/20153/12/2015 3:07:02 PMPPASS
Insulation // Chris Phone #: ###-####
BLD15-00476 BLD-Conference3/11/20153/12/20153/12/2015 1:55:32 PMPPEND
Guss Phone #: ###-####
GCB14-00009 GCB-Final3/11/20153/12/20153/12/2015 1:34:26 PMPPASS
Dillon ###-####
BLD14-00124 BLD-Final3/11/20153/12/20153/12/2015 1:33:56 PMAPASS
Anthony Phone #: ###-####
BLD14-00124 DOC - Permit Finaled3/12/20153/12/20153/12/2015 1:33:46 PMPPASS
GCB14-00092 GCB-Final3/11/20153/12/20153/12/2015 1:27:21 PMPPASS
Ted ###-#### - if Ted not available, see Gordon
BLD14-01937 BLD-Energy code compliance3/12/20153/12/20153/12/2015 12:44:24 PMAPASS
BLD13-03405 BLD-Framing/Rough-in3/11/20153/12/20153/12/2015 12:42:32 PMAPASS
Tower 3 trash shoot framing Phone #: ###-#### Inspection requested via web by Tim Toups