Inspections for the day of: Thursday, March 12, 2015.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00130 INSP-Sprinkler Rough-in3/12/20153/12/20153/12/2015 3:34:40 PMPPART
Piping above the new StarBucks is ok to cover. Rough-in passed at the Pharmacy but will need another inspection once the t-bar is installed. 2" line is not connected to the existing main yet.
BLD15-00471 FIRE-Final Inspection3/11/20153/12/20153/12/2015 3:02:31 PMPPASS
life safety passed
FIR14-00410 INSP-Final Inspection3/11/20153/12/20153/12/2015 3:02:13 PMAPASS
permit finaled
BLD15-00178 FIRE-Final Inspection3/12/20153/12/20153/12/2015 1:57:51 PMPPASS
life safety passed
GRD14-00016 FIRE-Final Inspection3/11/20153/12/20153/12/2015 1:50:27 PMAPASS
life safety passed
BLD15-00018 FIRE-Final Inspection3/11/20153/12/20153/12/2015 12:53:30 PMAPASS
Life safety passed. Contractor to remove both the thumbturn locks at the bottom of the main exit doors and provide sticker prior to the building inspection
BLD15-00583 FIRE-Final Inspection3/11/20153/12/20153/12/2015 12:31:07 PMAPASS
life safety passed
BLD14-01717 FIRE-Final Inspection3/10/20153/12/20153/12/2015 12:22:17 PMAPASS
life safety passed. Sticker over door is on the way
FIR14-00430 INSP-Sprinkler Rough-in3/11/20153/12/20153/12/2015 11:28:35 AMAPART
Requesting RTC inspection on the 5th floor, tower 3. Todays inspection included six apartments. See city approved plans for two of the six that are ok to cover as marked "ok" with todays date. The other four are mark for overspaced heads, blocked heads and missing heads and the piping can not be covered.
FIR14-00866 INSP-Sprinkler Rough-in3/10/20153/12/20153/12/2015 11:23:21 AMAPASS
Requesting RTC inspection on the 3th floor. See the city approved plans for rooms marked with "ok" and todays date where rough-in has passed.
FIR15-00039 INSP-Sprinkler Rough-in3/12/20153/12/20153/12/2015 9:54:07 AMAPASS
Underground ok to cover. All land scaping to be level with the sidewalk or the minimum 4'6" won"t be met
FIR13-00612 INSP-Final Inspection3/11/20153/12/20153/12/2015 8:35:00 AMAFAIL
I left message on contacts phone that I was on the way. Arrived at job site. No one was there and all apartments locked. Project related fire alarm permit has not been scheduled and the FACP is not powered up. No inspection was performed.
FIR14-00617 INSP-Sprinkler Rough-in3/12/20153/12/20153/12/2015 8:08:47 AMAPASS
Rough-in passed. Piping matches plans. Piping can not be covered untill a tenting inspection has been performed.
FIR15-00083 INSP-Final Inspection3/10/20153/12/20153/12/2015 8:03:57 AMAPASS
permit finaled. Netcon was a 5