FIR15-00130
| INSP-Sprinkler Rough-in | 3/12/2015 | 3/12/2015 | 3/12/2015 3:34:40 PM | P | PART |
|
|
Piping above the new StarBucks is ok to cover. Rough-in passed at the Pharmacy but will need another inspection once the t-bar is installed. 2" line is not connected to the existing main yet.
|
BLD15-00471
| FIRE-Final Inspection | 3/11/2015 | 3/12/2015 | 3/12/2015 3:02:31 PM | P | PASS |
|
|
life safety passed
|
FIR14-00410
| INSP-Final Inspection | 3/11/2015 | 3/12/2015 | 3/12/2015 3:02:13 PM | A | PASS |
|
|
permit finaled
|
BLD15-00178
| FIRE-Final Inspection | 3/12/2015 | 3/12/2015 | 3/12/2015 1:57:51 PM | P | PASS |
|
|
life safety passed
|
GRD14-00016
| FIRE-Final Inspection | 3/11/2015 | 3/12/2015 | 3/12/2015 1:50:27 PM | A | PASS |
|
|
life safety passed
|
BLD15-00018
| FIRE-Final Inspection | 3/11/2015 | 3/12/2015 | 3/12/2015 12:53:30 PM | A | PASS |
|
|
Life safety passed. Contractor to remove both the thumbturn locks at the bottom of the main exit doors and provide sticker prior to the building inspection
|
BLD15-00583
| FIRE-Final Inspection | 3/11/2015 | 3/12/2015 | 3/12/2015 12:31:07 PM | A | PASS |
|
|
life safety passed
|
BLD14-01717
| FIRE-Final Inspection | 3/10/2015 | 3/12/2015 | 3/12/2015 12:22:17 PM | A | PASS |
|
|
life safety passed. Sticker over door is on the way
|
FIR14-00430
| INSP-Sprinkler Rough-in | 3/11/2015 | 3/12/2015 | 3/12/2015 11:28:35 AM | A | PART |
|
|
Requesting RTC inspection on the 5th floor, tower 3. Todays inspection included six apartments. See city approved plans for two of the six that are ok to cover as marked "ok" with todays date. The other four are mark for overspaced heads, blocked heads and missing heads and the piping can not be covered.
|
FIR14-00866
| INSP-Sprinkler Rough-in | 3/10/2015 | 3/12/2015 | 3/12/2015 11:23:21 AM | A | PASS |
|
|
Requesting RTC inspection on the 3th floor. See the city approved plans for rooms marked with "ok" and todays date where rough-in has passed.
|
FIR15-00039
| INSP-Sprinkler Rough-in | 3/12/2015 | 3/12/2015 | 3/12/2015 9:54:07 AM | A | PASS |
|
|
Underground ok to cover. All land scaping to be level with the sidewalk or the minimum 4'6" won"t be met
|
FIR13-00612
| INSP-Final Inspection | 3/11/2015 | 3/12/2015 | 3/12/2015 8:35:00 AM | A | FAIL |
|
|
I left message on contacts phone that I was on the way. Arrived at job site. No one was there and all apartments locked. Project related fire alarm permit has not been scheduled and the FACP is not powered up. No inspection was performed.
|
FIR14-00617
| INSP-Sprinkler Rough-in | 3/12/2015 | 3/12/2015 | 3/12/2015 8:08:47 AM | A | PASS |
|
|
Rough-in passed. Piping matches plans. Piping can not be covered untill a tenting inspection has been performed.
|
FIR15-00083
| INSP-Final Inspection | 3/10/2015 | 3/12/2015 | 3/12/2015 8:03:57 AM | A | PASS |
|
|
permit finaled. Netcon was a 5
|