BLD17-04631
| BLD-Wall Bracing | 3/12/2019 | 3/12/2019 | 3/13/2019 8:23:25 AM | P | CANC |
|
|
First floor hold downs; exterior sheathing and shear walls and straps, good to go... Third floor, Rm 303, need truss Engineering fix or approval for A5A installed in wrong location...
|
BLD19-00268
| BLD-Foundation | 3/12/2019 | 3/12/2019 | 3/12/2019 5:11:22 PM | P | PASS |
|
|
Work in progress...
|
BLD19-00609
| BLD-Framing/Rough-in | 3/11/2019 | 3/12/2019 | 3/12/2019 5:11:01 PM | P | NR |
|
|
Contact: Brian Prussia ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
|
BLD18-04441
| BLD-Framing/Rough-in | 3/12/2019 | 3/12/2019 | 3/12/2019 5:10:49 PM | P | FAIL |
|
|
No corrections made...
|
BLD17-04339
| BLD-Wall Bracing | 3/12/2019 | 3/12/2019 | 3/12/2019 11:57:18 AM | P | PASS |
|
|
Ebra Phone #: ###-####
|
BLD18-04042
| BLD-Footing | 3/11/2019 | 3/12/2019 | 3/12/2019 11:57:07 AM | A | PASS |
|
|
Work in progress... Set backs per plans...
|
BLD18-04075
| BLD-Footing | 3/11/2019 | 3/12/2019 | 3/12/2019 11:56:36 AM | A | PART |
|
|
BLDG 7, South and West footings... Pend Special Inspection...
|
BLD18-04107
| BLD-Footing | 3/11/2019 | 3/12/2019 | 3/12/2019 11:55:30 AM | A | PASS |
|
|
Work in progress...
|
BLD19-00150
| BLD-Footing | 3/12/2019 | 3/12/2019 | 3/12/2019 9:03:33 AM | A | PASS |
|
|
Work in progress... Set backs per plot plan...
|
BLD19-00268
| BLD-Foundation | 3/11/2019 | 3/12/2019 | 3/12/2019 6:49:21 AM | A | CANC |
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Inspection cancelled from web by: Kyle Seick
|
BLD19-00268
| BLD-Foundation | 3/11/2019 | 3/12/2019 | 3/11/2019 5:27:30 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled via mobile web on Monday, March 11, 2019.
|