ELE19-02363
| Final | 3/12/2020 | 3/12/2020 | 3/12/2020 2:32:48 PM | P | PASS |
|
|
All units this building are ready 101-105 Phone #: ###-#### Inspection requested via web by Cevyn Recla Ok final units 101 and 102
|
ELE20-00862
| Electrical Rough-In | 3/11/2020 | 3/12/2020 | 3/12/2020 1:59:39 PM | P | PASS |
|
|
Bill Peace is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover 1 wall suite 100
|
ELE19-00947
| Electrical Rough-In | 3/12/2020 | 3/12/2020 | 3/12/2020 12:51:55 PM | P | PASS |
|
|
andy Phone #: ###-#### Ok cover 2nd floor ceiling by elevator.
|
ELE20-00845
| Conference | 3/11/2020 | 3/12/2020 | 3/12/2020 12:51:05 PM | A | DONE |
|
|
conference Phone #: ###-#### Inspection requested via web by Dan Hobdey Discussed install of new 400a service to feed 3 disconnects on side of home, and re-feed 3 existing panels on the interior.
|
ELE16-01189
| Final | 3/11/2020 | 3/12/2020 | 3/12/2020 11:56:45 AM | A | FAIL |
|
|
Taylor Phone #: ###-#### 1. AC whips need THHN, romex used right now. 2. 2nd AC has non-rated outdoor wiring. 3. Identify neutrals as hot wires in AC disconnects, also max fuse for AC installed is 25a. A 30a brkr is installed right now. 4. No GFI protection in garage. 5. Spark rings needed in all backsplash locatations. 6. GFI protection needed on back of kitchen island facing living. 7. Weather proof on back patio cannot be on with kitchen appliance circuit. 8. All bedroom lights need GFI protection. Verify smoke detectors are on ARC fault circuit. 9. Boxes in bonus need cover plates and lights need installed a long with stairwell. 10. 14-3 in bonus above panel needs installed in a box with wire nuts and blanked off. A licensed electrical contractor needs to be hired to complete all corrections. Posted notices on front window.
|
ELE19-02363
| Final | 3/11/2020 | 3/12/2020 | 3/12/2020 10:51:21 AM | A | PASS |
|
|
Looking for final on units 103, 104, and 105. Garage code 1268 Phone #: ###-#### Inspection requested via web by Cevyn Recla Units 103,104 and 105 Ok final
|
ELE20-00857
| Electrical Rough-In | 3/11/2020 | 3/12/2020 | 3/12/2020 9:30:31 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by ron spen cer Ok cover bathroom
|
ELE16-00796
| ELE-Aging Inspection | 3/12/2020 | 3/12/2020 | 3/12/2020 5:25:42 AM | | DONE |
|
|
We spoke on the phone on 12/12/19, we need to get a final inspection scheduled for this address. Please coordinate with homeowner.
|