Inspections for the day of: Friday, March 13, 1998.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD97-02306 INSP - Final3/13/19983/13/19983/16/1998 12:00:00 AMPPASS
03/13/98 407 - re-insp ,rear upper deck is being raised to minimum 36".a was a correction. LC#15541.
BLD98-00067 INSP - Framing/Rough-in3/13/19983/13/19983/16/1998 12:00:00 AMPPART
03/13/98 407 - need to add more fasteners at the garage fronts.where eng
BLD98-00116 INSP - Framing/Rough-in3/13/19983/13/19983/16/1998 12:00:00 AMPNR
03/13/98 407 - no ready no approved plans.
BLD98-00470 INSP - Foundation3/13/19983/13/19983/16/1998 12:00:00 AMPPART
03/13/98 407 - FOUNDATION ,exterior perimiter footings, early start perm approved plans on site.
BLD97-02804 INSP - Framing/Rough-in3/13/19983/13/19983/13/1998 12:00:00 AM FAIL
/ / 407 - re-insp.
BLD97-02882 INSP - Wall cover3/11/19983/13/19983/13/1998 12:00:00 AMAPASS
03/13/98 407 - fire wall dave ###-####
BLD97-03338 INSP - Final3/12/19983/13/19983/13/1998 12:00:00 AMAFAIL
03/13/98 407 - left corrections.
BLD98-00290 INSP - Wall cover3/11/19983/13/19983/13/1998 12:00:00 AMAPASS
03/13/98 407 - exterior nailing ok.
BLD97-02804 INSP - Energy code compliance3/12/19983/13/19983/13/1998 12:00:00 AMAPASS
03/13/98 407 - BOB ###-####
BLD97-02306 INSP - Final3/12/19983/13/19983/13/1998 12:00:00 AMACANC
03/13/98 407 - contractor has called and I have refered him to my Bob A, deals I said he would need to talk with Bob.
MEC98-00804 INSP - Framing/ Rough-in3/13/19983/13/19983/13/1998 12:00:00 AMPPASS
BLD96-02798 INSP - Framing/Rough-in3/13/19983/13/19983/13/1998 12:00:00 AMPPART
inspection of upper section g. ceiling grid has been installed.