FIR99-00604
| INSP-Sprinkler Rough-in | 3/13/2000 | 3/13/2000 | 3/13/2000 12:00:00 AM | | PART |
|
|
walked throug the building with Trent - new soffits are being installed near kitchen - may cause overspacing.
|
FIR99-00602
| INSP-Sprinkler Rough-in/Hydro | 3/13/2000 | 3/13/2000 | 3/13/2000 12:00:00 AM | A | PASS |
|
|
Bldg 4 hydro completed on 3/10 - okay
|
FIR99-00602
| INSP-Sprinkler Rough-in | 3/13/2000 | 3/13/2000 | 3/13/2000 12:00:00 AM | A | PART |
|
|
rough-in okay. still requires tenting check before cover
|
BLD98-01409
| FIRE-Conference | 3/13/2000 | 3/13/2000 | 3/13/2000 12:00:00 AM | A | PART |
|
|
gave general the requirements for the stair signage UBC Standard 10-2
|
FIR99-00109
| INSP-Sprinkler Rough-in/Hydro | 3/13/2000 | 3/13/2000 | 3/13/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 10:30:00. Contact: . Stand pipe and main riser hydro ok. 3/14/00 1:55:10 PM
|
BLD99-03094
| FIRE-Final Inspection | 3/13/2000 | 3/13/2000 | 3/13/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 11:09:56. Contact: ###-####.
|