BLD00-03068
| BLD-Footing | 3/12/2001 | 3/13/2001 | 3/13/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/12/2001 at 15:43:50. Contact: . placed with special insp. pending report / reviewed plan. 3/13/2001 4:51:43 PM
|
BLD00-02920
| BLD-Wall cover | 3/13/2001 | 3/13/2001 | 3/13/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/13/2001 at 05:48:00. Contact: ###-####. c/n pending. 3/13/2001 12:54:35 PM
|
BLD00-02170
| BLD-Framing/Rough-in | 3/12/2001 | 3/13/2001 | 3/13/2001 12:00:00 AM | A | FAIL |
|
|
WELDING ON ROOF AND FLOOR DECKING\\###-#### missing welds and botton punching on roof and 2 nd floor / special insp need to verify when corected. 3/13/2001 10:18:49 AM
|
BLD00-03718
| BLD-Final | 3/12/2001 | 3/13/2001 | 3/13/2001 12:00:00 AM | P | PASS |
|
|
###-#### final ok . 3/14/2001 9:22:12 AM
|
BLD00-01563
| BLD-Concrete | 3/13/2001 | 3/13/2001 | 3/13/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/13/2001 at 05:49:05. Contact: ###-####. placed with special insp.pending report. 3/13/2001 12:59:10 PM
|
BLD01-00540
| BLD-Footing | 3/13/2001 | 3/13/2001 | 3/13/2001 12:00:00 AM | P | NR |
|
|
FT INSP ###-#### -JERRY
|