Inspections for the day of: Tuesday, March 13, 2001.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00075 BLD-Framing/Rough-in3/12/20013/13/20013/13/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/12/2001 at 11:17:30. Contact: .c/n posted 3/13/2001 12:24:26 PM
BLD00-00092 BLD-Framing/Rough-in3/12/20013/13/20013/13/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 03/12/2001 at 11:37:17. Contact: ###-####.house has been finaled ? 3/13/2001 12:24:15 PM
BLD00-03090 BLD-Final3/12/20013/13/20013/13/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/12/2001 at 12:02:23. Contact: ###-####.c/n posted. 3/13/2001 12:24:53 PM
BLD00-02858 BLD-Final3/12/20013/13/20013/13/2001 12:00:00 AMAFAIL
###-####c/n posted 3/13/2001 12:23:42 PM
BLD01-00374 BLD-Foundation3/12/20013/13/20013/13/2001 12:00:00 AMAPART
###-####poured appears ok. 3/13/2001 12:24:39 PM
BLD00-00048 BLD-Final3/12/20013/13/20013/13/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/12/2001 at 16:59:34. Contact: ###-####.ok temp oc. need letter from MTI-Engineer to approve letter . also rear trash compactor area has racks that need bolts. also need perm oc from zoning.all others have signed perm. 3/14/2001 10:02:17 AM
BLD00-00093 BLD-Energy code compliance3/13/20013/13/20013/13/2001 12:00:00 AMPPASS
Ron ###-####