BLD02-00167
| BLD-Foundation | 3/12/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | A | PART |
|
|
###-#### fireplace deleted/ wall lateral ok to delete straps in back corners will meet with out alternet pannels. 3/13/2002 8:57:38 AM
|
BLD01-01863
| BLD-Framing/Rough-in | 3/13/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | P | FAIL |
|
|
fr dave ###-#### need truss engineering and leadger at ceilling framing steel joist at frame wall. 3/13/2002 4:35:14 PM
|
BLD01-03161
| BLD-Framing/Rough-in | 3/13/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | P | FAIL |
|
|
###-#### blk bearing point at 48 inch cantalever roof. 3/13/2002 5:11:33 PM
|
BLD01-02268
| BLD-Final | 3/13/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | P | FAIL |
|
|
###-#### no access in to bldg. 3/13/2002 4:43:27 PM
|
BLD01-03228
| BLD-Footing | 3/12/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 12:39:03. Contact: ###-####. north ft and 50% ok east ft rebar ok. 3/13/2002 4:31:06 PM
|