BLD98-03705
| BLD-Footing | 3/11/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 11:36:55. Contact: . north side int col ftgs ok pend report 3/13/2002 2:58:46 PM
|
BLD01-02821
| BLD-Framing/Rough-in | 3/12/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | A | PART |
|
|
###-#### TONY grid clg reinsp ok (per c/n onsite) ok to drop tiles 3/13/2002 9:29:20 AM
|
BLD00-03538
| BLD-Conference | 3/12/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 340 On 3/12/2002 3:42:06 PM Mel ###-#### w/ Mike Phillips re future apts above.. 3hr .expansion joint firestop assy req'd, (by MK or apt. contractor?) 3/13/2002 3:49:27 PM
|
BLD02-00377
| BLD-Footing | 3/13/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | P | PART |
|
|
###-#### JED poured 3/13/2002 4:41:35 PM
|
BLD01-03156
| BLD-Foundation | 3/13/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | P | PART |
|
|
found rob ###-#### masonry lift ok; wip on stair enclosures 3/13/2002 4:15:31 PM
|
BLD01-03189
| BLD-Final | 3/13/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | P | FAIL |
|
|
fn insp ###-####- tim install grab bars, clarify ADA issues w/ arch/plan reviewer. 3/13/2002 3:36:50 PM
|
MIS02-00023
| BLD-Conference | 3/13/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 3/13/2002 3:42:27 PM w/ contractor re installation of retaining structure at 8th st side
|
BLD00-02375
| BLD-Conference | 3/13/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/13/2002 3:47:24 PM w/ Dan Stuart & GS...reviewed specs for 90min rated 3" solid glass"Vista brick" window assy...approved as fire rated window assy at north side occupancy separation/exterior wall...all sides are bounded by masonry to achieve 90 min rating( per detail)
|
BLD00-03361
| BLD-Conference | 3/13/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/13/2002 4:40:54 PM re expansion joint firestop system; keep c/n
|