FIR02-00059
| INSP-Alarm Testing | 3/12/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 14:52:32. Contact: ###-####. Found two horn/strobes within this project T-tapped. One was the new strobe in the bathroom and the other one on the adjacent wall. Fixed by Mike Kroll and tested. Installed per plans. Installer of T-tapped devices was "Danny". 3/13/2002 10:29:13 AM
|
FIR02-00059
| INSP-Final Inspection | 3/12/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 14:54:57. Contact: ###-####.
|
FIR00-00123
| INSP-Final Inspection | 3/13/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 409 On 3/13/2002 8:45:47 AM
|
BLD01-03189
| FIRE-Final Inspection | 3/13/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 409 On 3/13/2002 10:27:07 AM
|
BLD01-00594
| BLD-Conference | 3/12/2002 | 3/13/2002 | 3/13/2002 12:00:00 AM | P | PART |
|
|
dave -###-#### for conf showed locations for fire lanes; need address, extinguishers, map signage at entrances and signs at entrance to park in marked stalls only 3/13/2002 2:33:20 PM
|