BLD02-01062
| BLD-Aging Inspection | 3/13/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | | CANC |
|
|
|
BLD02-02756
| BLD-Final | 3/12/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | A | CANC |
|
|
JEFF--CALL 1ST BEFORE INSP; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
MEC03-00408
| Final | 3/12/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | A | PART |
|
|
###-####. support flex duct and add combustion air in water heater closet. ok temp oc. 3/13/2003 11:19:45 AM
|
BLD03-00278
| BLD-Framing/Rough-in | 3/12/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | A | PART |
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Annette Moore. Ok to insulate need beam calcs for the (2) 9" micro lams not shown on the structual typical cross section. 3/13/2003 10:40:29 AM
|
MEC03-00631
| Pressure Test | 3/12/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 3/12/2003 at 11:05:52 AM. Contact: ###-####.no work done. 3/13/2003 10:10:40 AM
|
BLD02-02068
| BLD-Framing/Rough-in | 3/12/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | A | PART |
|
|
###-####. ceiling grid ok. 3/13/2003 11:19:06 AM
|
BLD03-00037
| BLD-Framing/Rough-in | 3/12/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | A | PART |
|
|
CLINT SHEAR NAIL; Phone #: ###-#### Internet Inspection Request from: Darla Downs Ok except front entry not completed. 3/13/2003 12:11:41 PM
|
MEC02-03811
| Final | 3/12/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/12/2003 at 2:03:28 PM. Contact: ###-####.
|
BLD02-02779
| BLD-Final | 3/12/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | P | NR |
|
|
###-#### randy This needs all other trades signed off prior to final. 3/13/2003 2:53:30 PM
|
BLD02-03096
| BLD-Foundation | 3/13/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | P | PASS |
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
MEC03-00174
| Final | 3/13/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/13/2003 at 9:06:12 AM. Contact: ###-####.
|
MEC03-00056
| Final | 3/13/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | P | FAIL |
|
|
###-####posted c/n. 3/13/2003 1:06:03 PM
|
BLD02-02484
| BLD-Final | 3/13/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | P | FAIL |
|
|
###-####c/n posted. 3/13/2003 1:51:32 PM
|
BLD99-02651
| BLD-Conference | 3/13/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | P | PART |
|
|
Meetr with Steve Carlson will be submitting letter of request for extension and intent for all violations on property. 3/13/2003 2:52:40 PM
|
MEC02-03617
| Conference | 3/13/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | P | PASS |
|
|
|