FIR02-00380
| INSP-Final Inspection | 3/12/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | A | FAIL |
|
|
###-#### dean The existing notification circuit still needs repaired. 3/13/2003 11:18:53 AM
|
FIR02-00512
| INSP-Final Inspection | 3/12/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | A | FAIL |
|
|
###-#### The 12 volt power supply #2 needs 26 ah batteries, need letter from Grinnell on verification of inspectors tests orfice size, provide verification on the knox key boxes are ok with the fire dept 3/13/2003 10:02:53 AM
|
FIR02-00423
| INSP-Sprinkler Rough-in/Hydro | 3/12/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | A | PART |
|
|
sprinkler piping is ok to cover in rooms marked on the job site approved plans. Upright sprinkler heads to be added above the mens restroom 3/13/2003 1:36:49 PM
|
BLD02-02639
| FIRE-Final Inspection | 3/12/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | A | PASS |
|
|
bob- ###-#### Fire life safety finaled 3/13/2003 10:28:52 AM
|
BLD02-02924
| FIRE-Final Inspection | 3/13/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | P | FAIL |
|
|
###-#### Could not perform a final inspection due to fire alarm plans not having been resubmitted due to the two duct smoke detectors. I spoke with the contractor about live safety requirements 3/13/2003 3:07:28 PM
|
FIR02-00385
| INSP-Conference | 3/11/2003 | 3/13/2003 | 3/13/2003 12:00:00 AM | P | PART |
|
|
Inspection was for the testing of the fire pump. Russ with Nickerson pump was present to perform the test 3/13/2003 3:26:55 PM
|