ESC05-00472
| Tracking Control | 2/20/2007 | 3/13/2007 | 3/14/2007 2:15:26 PM | A | PART |
|
|
Site looks okay. Contacted RP about some minimal trackout that needs to be addressed.
|
ESC05-01868
| Tracking Control | 2/20/2007 | 3/13/2007 | 3/14/2007 2:13:08 PM | A | PASS |
|
|
Site looks okay, all bmp's are being maintained.
|
ESC06-00825
| Tracking Control | 2/20/2007 | 3/13/2007 | 3/14/2007 2:12:36 PM | A | PASS |
|
|
Site looks okay, all bmp's are being maintained.
|
ESC05-01141
| Tracking Control | 2/20/2007 | 3/13/2007 | 3/14/2007 2:12:00 PM | A | PASS |
|
|
Site looks okay, all bmp's are being maintained.
|
ESC06-01455
| Tracking Control | 2/20/2007 | 3/13/2007 | 3/13/2007 2:47:35 PM | A | PASS |
|
|
Site looks okay. All bmp's are being maintained.
|
ESC06-01652
| Tracking Control | 2/20/2007 | 3/13/2007 | 3/13/2007 2:46:34 PM | A | PASS |
|
|
Site looks okay. All bmp's are being maintained.
|
ESC06-01917
| Tracking Control | 2/20/2007 | 3/13/2007 | 3/13/2007 2:45:41 PM | A | PART |
|
|
Contacted RP about all his houses in the subdivision. Some minimal trackout needs to be addressed and I suggested that he increase the frequency of the street sweeper, make sure all ESC signs are posted, and that dust control is in place during the excavation phase. Also trash maintenance was needed on some of the sites.
|
ESC06-01873
| Tracking Control | 2/20/2007 | 3/13/2007 | 3/13/2007 2:44:56 PM | A | PART |
|
|
Contacted RP about all his houses in the subdivision. Some minimal trackout needs to be addressed and I suggested that he increase the frequency of the street sweeper, make sure all ESC signs are posted, and that dust control is in place during the excavation phase. Also trash maintenance was needed on some of the sites.
|
ESC07-00241
| Tracking Control | 3/13/2007 | 3/13/2007 | 3/13/2007 2:44:16 PM | P | PART |
|
|
Contacted RP about all his houses in the subdivision. Some minimal trackout needs to be addressed and I suggested that he increase the frequency of the street sweeper, make sure all ESC signs are posted, and that dust control is in place during the excavation phase. Also trash maintenance was needed on some of the sites.
|
ESC07-00186
| Tracking Control | 3/13/2007 | 3/13/2007 | 3/13/2007 2:43:59 PM | P | PART |
|
|
Contacted RP about all his houses in the subdivision. Some minimal trackout needs to be addressed and I suggested that he increase the frequency of the street sweeper, make sure all ESC signs are posted, and that dust control is in place during the excavation phase. Also trash maintenance was needed on some of the sites.
|
ESC07-00230
| Tracking Control | 3/13/2007 | 3/13/2007 | 3/13/2007 2:43:43 PM | P | PART |
|
|
Contacted RP about all his houses in the subdivision. Some minimal trackout needs to be addressed and I suggested that he increase the frequency of the street sweeper, make sure all ESC signs are posted, and that dust control is in place during the excavation phase. Also trash maintenance was needed on some of the sites.
|
ESC07-00095
| Tracking Control | 3/13/2007 | 3/13/2007 | 3/13/2007 2:43:21 PM | P | PART |
|
|
Contacted RP about all his houses in the subdivision. Some minimal trackout needs to be addressed and I suggested that he increase the frequency of the street sweeper, make sure all ESC signs are posted, and that dust control is in place during the excavation phase. Also trash maintenance was needed on some of the sites.
|
ESC07-00225
| Tracking Control | 3/13/2007 | 3/13/2007 | 3/13/2007 2:43:04 PM | P | PART |
|
|
Contacted RP about all his houses in the subdivision. Some minimal trackout needs to be addressed and I suggested that he increase the frequency of the street sweeper, make sure all ESC signs are posted, and that dust control is in place during the excavation phase. Also trash maintenance was needed on some of the sites.
|
ESC07-00239
| Tracking Control | 3/13/2007 | 3/13/2007 | 3/13/2007 2:42:42 PM | P | PART |
|
|
Contacted RP about all his houses in the subdivision. Some minimal trackout needs to be addressed and I suggested that he increase the frequency of the street sweeper, make sure all ESC signs are posted, and that dust control is in place during the excavation phase. Also trash maintenance was needed on some of the sites.
|
ESC06-01216
| Complaint Inspection | 3/13/2007 | 3/13/2007 | 3/13/2007 1:25:45 PM | P | CANC |
|
|
|
ESC06-00128
| Complaint Inspection | 3/13/2007 | 3/13/2007 | 3/13/2007 1:25:06 PM | P | FAIL |
|
|
|
ESC06-00130
| Complaint Inspection | 3/13/2007 | 3/13/2007 | 3/13/2007 1:24:18 PM | P | FAIL |
|
|
Responded to citizen complaint regarding trackout from site. C/N issued and posted on site to address trackout and provisions needed to prevent further problems. Contacted RP and advised that street sweeping needed to be completed by the end of the day. Site will be paved by the end of next week. I will reinpsect site on 3-16-07. Informed citizen of action taken.
|
ESC06-00131
| Complaint Inspection | 3/13/2007 | 3/13/2007 | 3/13/2007 1:24:06 PM | P | FAIL |
|
|
Responded to citizen complaint regarding trackout from site. C/N issued and posted on site to address trackout and provisions needed to prevent further problems. Contacted RP and advised that street sweeping needed to be completed by the end of the day. Site will be paved by the end of next week. I will reinpsect site on 3-16-07. Informed citizen of action taken.
|
ESC06-00129
| Complaint Inspection | 3/13/2007 | 3/13/2007 | 3/13/2007 1:23:52 PM | P | FAIL |
|
|
Responded to citizen complaint regarding trackout from site. C/N issued and posted on site to address trackout and provisions needed to prevent further problems. Contacted RP and advised that street sweeping needed to be completed by the end of the day. Site will be paved by the end of next week. I will reinpsect site on 3-16-07. Informed citizen of action taken.
|
ESC07-00011
| Tracking Control | 3/13/2007 | 3/13/2007 | 3/13/2007 12:52:37 PM | P | PART |
|
|
Verbal c/n to RP to stabilize stockpiled soil in front of site to prevent any trackout or erosion onto Hervey. RP indicated that soil will be removed by Thursday.
|
ESC07-00079
| BMP Violation | 3/13/2007 | 3/13/2007 | 3/13/2007 12:39:49 PM | P | PART |
|
|
Verbal c/n to RP to address some trackout from the site caused by backfilling. Sweeping will be completed by the end of the day.
|