ESC08-00064
| Site Preparation | 3/13/2008 | 3/13/2008 | 3/14/2008 8:14:11 AM | P | PART |
|
|
Construction entrance installed on one side of project need to install proper entrance on the other side of fairview. Everything slopes into project, no perimeter protection needed. Basin installed but not complete. Needs to have a soil stabilizer to all disturbed soil. CAS #460
|
ESC07-01007
| Random Inspection | 3/13/2008 | 3/13/2008 | 3/13/2008 3:12:01 PM | P | CANC |
|
|
Discussed with RP (JC Whittney) over posting there ESC Permit and also there NOI at the front of project.
|
ESC07-01541
| Tracking Control | 3/13/2008 | 3/13/2008 | 3/13/2008 11:30:04 AM | A | FAIL |
|
|
Left a message for the RP in regards to the tracking coming off of project into the apartment community and into the Washington Mutal parking lot. Also the ESC permit needs to be posted. Will re-inspect 3/14/07. CAS#460
|
ESC06-01517
| Site Final | 3/13/2008 | 3/13/2008 | 3/13/2008 10:34:20 AM | A | CANC |
|
|
|