BLD08-00703
| FIRE-Final Inspection | 3/13/2009 | 3/13/2009 | 3/13/2009 5:22:16 PM | P | PART |
|
|
Project related fire alarm permit work finaled.
|
FIR08-00699
| INSP-Sprinkler Rough-in | 3/12/2009 | 3/13/2009 | 3/13/2009 5:21:45 PM | A | PART |
|
|
OH rough-in okayed at the administration area and hard lid ceilings per plan annotations marked with today's date.
|
BLD08-01261
| FIRE-Final Inspection | 3/11/2009 | 3/13/2009 | 3/13/2009 5:20:28 PM | A | PASS |
|
|
Noted three exit signs to be repaired on battery backup-contractor to repair and have verified by structural inspector at final.
|
BLD08-01479
| FIRE-Final Inspection | 3/11/2009 | 3/13/2009 | 3/13/2009 5:18:22 PM | A | PASS |
|
|
Fire life safety inspection completed acceptable.
|
FIR09-00158
| INSP-Final Inspection | 3/12/2009 | 3/13/2009 | 3/13/2009 5:17:27 PM | A | PASS |
|
|
Fire sprinkler work passed inspection, permit finaled.
|
FIR08-00018
| INSP-Sprinkler Rough-in/Hydro | 3/11/2009 | 3/13/2009 | 3/13/2009 9:23:08 AM | P | CANC |
|
|
17-18 - contact: Jeff Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|