Inspections for the day of: Friday, March 13, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00778 INSP-Sprinkler Rough-in/Hydro3/13/20093/13/20093/13/2009 4:16:25 PMPPASS
See the city approved plans for locations where the sprinkler piping can be covered.
FIR09-00065 INSP-Final Inspection3/13/20093/13/20093/13/2009 3:37:53 PMPPASS
Permit finaled
FIR09-00161 INSP-Sprinkler Rough-in/Hydro3/12/20093/13/20093/13/2009 3:37:25 PMPCANC
Not ready for an inspection per Ken. WIll be rescheduled for next week.
FIR09-00065 INSP-Sprinkler Rough-in/Hydro3/13/20093/13/20093/13/2009 3:36:16 PMPPASS
permit finaled
FIR08-00367 INSP-Alarm Testing3/11/20093/13/20093/13/2009 11:14:12 AMAPASS
See the city approved plans for the initiating devices tested today and the deficiencies found. As-built drawings are required showing the relocated smoke detectors and door holders as well as the new duct smoke detectors.
BLD08-02172 FIRE-Final Inspection3/12/20093/13/20093/13/2009 11:11:59 AMAPASS
Life safety passed. The contractor stated that the building address would be installed on both sides of the marquee at the street and the thumbturn dead bolt would be removed from the northwest exit door.
FIR07-00132 INSP-Sprinkler Rough-in3/12/20093/13/20093/13/2009 10:42:11 AMACANC
wrong inspection called in.