FIR11-00575
| INSP-Alarm Testing | 3/13/2012 | 3/13/2012 | 3/16/2012 4:16:54 PM | P | PART |
|
|
Completed notification testing for project phase one areas including fabrication, cleanroom, mechanical, dock, and link corridors. Corrections and adjustments include; device location at mechanical room 44, obstructions to coverage at the mechanical deck due to equipment layout, one overspaced appliance at the service area above the photo bay, five TEM labs are below min. dB, insufficient visual coverage at the mechanical catwalks in two areas. Field inspection completed 3/12.
|
BLD12-00133
| FIRE-Conference | 3/13/2012 | 3/13/2012 | 3/16/2012 11:04:03 AM | P | DONE |
|
|
Conversation with contractor regarding plan review report notes (page 2) concerning the egress system.
|
FIR12-00121
| INSP-Sprinkler Rough-in | 3/13/2012 | 3/13/2012 | 3/16/2012 9:47:14 AM | A | PART |
|
|
Overhead rough-in approved.
|
BLD12-00337
| FIRE-Final Inspection | 3/13/2012 | 3/13/2012 | 3/13/2012 10:33:20 AM | A | PART |
|
|
Project related fire alarm permit FIR12-00128 is in "ready to issue" status.
|
BLD12-00215
| FIRE-Conference | 3/13/2012 | 3/13/2012 | 3/13/2012 10:31:25 AM | A | DONE |
|
|
Modifications to fire alarm or sprinkler systems will need separate permits as noted.
|
BLD11-01199
| FIRE-Final Inspection | 3/13/2012 | 3/13/2012 | 3/13/2012 10:24:25 AM | A | PASS |
|
|
|
FIR12-00117
| INSP-Final Inspection | 3/13/2012 | 3/13/2012 | 3/13/2012 12:00:00 AM | P | CANC |
|
|
For permit final ###-#### Cancel per Alex @ 3:15pm
|
FIR12-00117
| INSP-Sprinkler Rough-in | 3/9/2012 | 3/13/2012 | 3/13/2012 12:00:00 AM | P | CANC |
|
|
ALEX Phone #: ###-####--Cancel per Alex @ 3:15pm
|