Inspections for the day of: Tuesday, March 13, 2012.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00575 INSP-Alarm Testing3/13/20123/13/20123/16/2012 4:16:54 PMPPART
Completed notification testing for project phase one areas including fabrication, cleanroom, mechanical, dock, and link corridors. Corrections and adjustments include; device location at mechanical room 44, obstructions to coverage at the mechanical deck due to equipment layout, one overspaced appliance at the service area above the photo bay, five TEM labs are below min. dB, insufficient visual coverage at the mechanical catwalks in two areas. Field inspection completed 3/12.
BLD12-00133 FIRE-Conference3/13/20123/13/20123/16/2012 11:04:03 AMPDONE
Conversation with contractor regarding plan review report notes (page 2) concerning the egress system.
FIR12-00121 INSP-Sprinkler Rough-in3/13/20123/13/20123/16/2012 9:47:14 AMAPART
Overhead rough-in approved.
BLD12-00337 FIRE-Final Inspection3/13/20123/13/20123/13/2012 10:33:20 AMAPART
Project related fire alarm permit FIR12-00128 is in "ready to issue" status.
BLD12-00215 FIRE-Conference3/13/20123/13/20123/13/2012 10:31:25 AMADONE
Modifications to fire alarm or sprinkler systems will need separate permits as noted.
BLD11-01199 FIRE-Final Inspection3/13/20123/13/20123/13/2012 10:24:25 AMAPASS
FIR12-00117 INSP-Final Inspection3/13/20123/13/20123/13/2012 12:00:00 AMPCANC
For permit final ###-#### Cancel per Alex @ 3:15pm
FIR12-00117 INSP-Sprinkler Rough-in3/9/20123/13/20123/13/2012 12:00:00 AMPCANC
ALEX Phone #: ###-####--Cancel per Alex @ 3:15pm