ESC11-00879
| General Inspection | 3/1/2012 | 3/13/2012 | 3/14/2012 2:57:01 PM | A | PART |
|
|
After stop work was placed on the project the contactor took the inititive to clean up all sediment off of all the hard surface and devert all runoff form the construction area towards the road back into the the project area. Will re-inspect tomorrow to inspect site condition once again.
|
ESC11-00386
| General Inspection | 3/13/2012 | 3/13/2012 | 3/13/2012 5:12:37 PM | | PART |
|
|
vegitation has not esctablished enough to final out the ESC permit.
|
ESC11-00732
| Complaint Inspection | 3/13/2012 | 3/13/2012 | 3/13/2012 11:39:29 AM | P | FAIL |
|
|
Verbal to RP; Stop all activities. Only allowed to correctthe discharge over the greenbelt into the Wallings corridor that has generated a turbid discharge and created rilling throught the recently placed top soil. Will be meeting with the RP on corrective actions that are occuring at this time and ost discharge structures today or on 3/14/2012.
|
ESC11-00593
| Aging Inspection | 3/13/2012 | 3/13/2012 | 3/13/2012 9:46:19 AM | | PASS |
|
|
|
ESC11-00819
| General Inspection | 3/13/2012 | 3/13/2012 | 3/13/2012 9:39:20 AM | | PASS |
|
|
|
ESC11-00840
| General Inspection | 3/13/2012 | 3/13/2012 | 3/13/2012 9:33:25 AM | | PART |
|
|
Must provide a washout prior to the placement of concrete.
|
ESC11-00863
| General Inspection | 3/13/2012 | 3/13/2012 | 3/13/2012 9:05:42 AM | | FAIL |
|
|
Verbal to RP: Clean up access at the asphalt infront of the gravel area of sediment off of the hard surface. Install a perimeter sediment barrier below the concrete washout area close to the street. Will follow up on 3/14/2012 pm.
|