PLM12-02837
| PLM-Aging Inspection | 3/13/2013 | 3/13/2013 | 3/14/2013 11:12:34 AM | | NR |
|
|
job on hold....ds
|
ESC12-00656
| Aging Inspection | 3/13/2013 | 3/13/2013 | 3/13/2013 3:41:09 PM | | PASS |
|
|
|
PLM13-00101
| Plumbing Rough-in | 3/13/2013 | 3/13/2013 | 3/13/2013 3:39:02 PM | P | CANC |
|
|
11TH FLOOR ROUGH IN. JOB CONTACT IS KEITH Phone #: ###-#### >> Inspection requested via web by ADAM WARR xcld will reschedule when lift is operational.
|
PLM12-01786
| Final | 3/13/2013 | 3/13/2013 | 3/13/2013 3:37:06 PM | P | PART |
|
|
Back door unlocked. Phone #: ###-#### >> Inspection requested via web by Janene Taylor water heater not installed yet........ds
|
PLM13-00309
| Groundwork | 3/13/2013 | 3/13/2013 | 3/13/2013 2:55:12 PM | P | PASS |
|
|
DALE Phone #: ###-####
|
PLM12-03146
| Plumbing Rough-in | 3/12/2013 | 3/13/2013 | 3/13/2013 2:22:47 PM | P | FAIL |
|
|
JOB # 16625. Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes tested ok but ned to tent water lines above ceiling space for freezing, shower in outside wall needs to be plumbed so it can be drained in cold weather, where is drainfor outside shower? And drinking fountain needs to be plumbed to drain for winter......................ds
|
PLM13-00482
| Plumbing Rough-in | 3/12/2013 | 3/13/2013 | 3/13/2013 11:56:35 AM | A | PASS |
|
|
Doug Phone #: ###-####
|
PLM13-00520
| Final | 3/13/2013 | 3/13/2013 | 3/13/2013 9:43:33 AM | A | PASS |
|
|
|
PLM13-00520
| Water and/or Sewer | 3/12/2013 | 3/13/2013 | 3/13/2013 9:43:00 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Darren Wood
|
ESC12-00650
| Aging Inspection | 3/13/2013 | 3/13/2013 | 3/13/2013 9:09:35 AM | | PASS |
|
|
wip
|
PLM12-02191
| PLM-Aging Inspection | 3/13/2013 | 3/13/2013 | 3/13/2013 9:05:20 AM | | NR |
|
|
|
GCP13-00041
| GCP-Final | 3/12/2013 | 3/13/2013 | 3/13/2013 9:02:34 AM | A | PASS |
|
|
Todd @ ###-####
|