FIR13-00011
| INSP-Sprinkler Rough-in | 3/11/2013 | 3/12/2013 | | P | |
|
|
This is for the 3rd, 4th & 5th Fl. Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR13-00007
| INSP-Final Inspection | 3/13/2013 | 3/13/2013 | 3/14/2013 5:30:52 PM | A | PASS |
|
|
Fire alarm permit finaled.
|
FIR13-00084
| INSP-Final Inspection | 3/13/2013 | 3/13/2013 | 3/14/2013 5:29:22 PM | A | PASS |
|
|
Inspection passed, permit finaled.
|
FIR12-00019
| INSP-Final Inspection | 3/13/2013 | 3/13/2013 | 3/14/2013 5:28:05 PM | A | PASS |
|
|
Fire alarm permit finaled.
|
FIR13-00053
| INSP-Final Inspection | 3/12/2013 | 3/13/2013 | 3/14/2013 7:28:48 AM | A | PASS |
|
|
Fire sprinkler permit finaled, inspection passed.
|
FIR13-00054
| INSP-Final Inspection | 3/12/2013 | 3/13/2013 | 3/14/2013 7:22:25 AM | A | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR12-00017
| INSP-Sprinkler Rough-in | 3/12/2013 | 3/13/2013 | 3/14/2013 7:21:07 AM | P | PART |
|
|
Okay to cover drop ceilings at the 3rd and 4th floor north ends, and the sheetrock soffits at the 3rd floor elevator lobby. Upright coverage at the electrical room 3rd floor not yet installed.
|
BLD12-03185
| FIRE-Final Inspection | 3/13/2013 | 3/13/2013 | 3/14/2013 7:15:48 AM | P | PASS |
|
|
Fire life safety approved pending the 1A rated extinguisher is replaced with a min 2A10BC as discussed and per review comments.
|
FIR13-00029
| INSP-Final Inspection | 3/11/2013 | 3/13/2013 | 3/14/2013 7:12:40 AM | A | PASS |
|
|
Scope of work completed, both rough-in and final inspections passed.
|
FIR13-00101
| INSP-Sprinkler Rough-in | 3/12/2013 | 3/13/2013 | 3/14/2013 7:10:30 AM | A | PART |
|
|
UG fire supply line okay for bury
|
FIR11-00314
| INSP-Final Inspection | 3/13/2013 | 3/13/2013 | 3/13/2013 6:17:14 AM | A | CANC |
|
|
Please call 30 min prior to arrival. Phone #: ###-#### >> Inspection requested via web by Jeff Walton Inspection cancelled from web by: Jeff Walton
|