ESC12-00599
| General Inspection | 3/8/2013 | 3/13/2013 | 3/15/2013 3:04:23 PM | A | DONE |
|
|
Called Jessie (RP) to ask about status of permit amendment. Jessie indicated it should be complete or close to and will follow up with civil engineer.
|
ESC13-00125
| General Inspection | 3/13/2013 | 3/13/2013 | 3/15/2013 2:46:11 PM | | DONE |
|
|
Knife river to submit new dewatering plan to the City per conference. New parameters consist of 350 - 700 gpm continuously for 6-10 days.
|
ESC13-00144
| Random Inspection | 3/13/2013 | 3/13/2013 | 3/13/2013 4:25:50 PM | P | PART |
|
|
Conducted partial inspection of staging area and dewatering. In process of dewatering in ACHD ROW to ditch (not boise jurisdication) Left message for Ryan (RP) to schedule walk through. Ponds for dewatering contaminated water must be lined prior to using them. Need to check calcs for tanks size.
|
ESC12-00024
| General Inspection | 3/13/2013 | 3/13/2013 | 3/13/2013 1:48:39 PM | | PASS |
|
|
|
ESC12-00974
| Conference | 3/12/2013 | 3/13/2013 | 3/13/2013 1:34:59 PM | P | PART |
|
|
Meet Jon F (RP) at 1:30. Slope has been terraced and heavily seeded with a dryl and seedmix, ryegrass and clover. (reseeded 3/8/12). Mix included fertilizer. Some areas of slope may need re-terraced because of kids playing on it. RP will monitor. Discussed temporary and permanent stabilization requirements with RP
|
ESC12-01214
| BMP Violation | 3/12/2013 | 3/13/2013 | 3/13/2013 12:00:00 AM | A | PASS |
|
|
|
ESC13-00068
| BMP Violation | 3/12/2013 | 3/13/2013 | 3/13/2013 12:00:00 AM | A | PART |
|
|
concrete washout removed and cleaned up. Stil has dirt in gutter to sweep up and housekeeping to clean up. Will re-inspect monday 3/18
|