ESC13-00788
| General Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 12:06:27 PM | | PART |
|
|
No current ESC violations observed, but fees due for a past re-inspection. Email sent to RP and contractor.
|
ESC13-00082
| General Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 11:40:17 AM | | PASS |
|
|
Stabization and landscaping not yet complete. No trackout or other violations observed. No activity at time of inspection.
|
ESC13-01247
| General Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 11:10:43 AM | | PASS |
|
|
Stabilization in progress. Wattles still installed. Erosion control mats are in good condition with grass starting to pop through. No corrections at this time.
|
ESC13-00475
| General Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 10:55:50 AM | | PASS |
|
|
House construction in near completion. Yard is not yet stabilized. No corrections required at this time. Sidewalk has been swept.
|
ESC12-00539
| General Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 10:27:22 AM | | PASS |
|
|
|
ESC13-01226
| Random Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 9:38:27 AM | P | PASS |
|
|
Boise Heights phase I is in compliance. Construction entrance has an elevated grate bridge which can be used as a wheel wash. No sediment leaving site, DI's have protection. Did not detect any dewatering activities.
|
ESC14-00019
| General Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 9:36:20 AM | | PASS |
|
|
No earthwork yet, permit is posted. No violations observed.
|
ESC14-00051
| Conference | 3/13/2014 | 3/13/2014 | 3/13/2014 9:20:42 AM | A | DONE |
|
|
Eaglewood RP Adam called to discuss illicit washout I issued to both contractors (Eaglewood and Riverwood). He stated he will work with Kent to clean up the mess and prevent future incidents. Still unknown which contractor is the true culprit. Will continue to monitor situation.
|
ESC13-00425
| General Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 9:10:49 AM | | PASS |
|
|
|
ESC14-00046
| General Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 8:50:04 AM | | PASS |
|
|
|