ESC14-00296
| General Inspection | 3/13/2015 | 3/13/2015 | 3/13/2015 1:12:21 PM | | PASS |
|
|
Construction of the basement parking, and side building currently occuring. No hauling offsite at this time. No ESC issues at time of inspection
|
ESC14-00771
| General Inspection | 3/13/2015 | 3/13/2015 | 3/13/2015 11:23:43 AM | | PASS |
|
|
WIP: no esc issues at this time
|
ESC13-00520
| General Inspection | 3/13/2015 | 3/13/2015 | 3/13/2015 9:35:58 AM | | PASS |
|
|
No activity at this time waiting for perminant stabilization
|
ESC15-00234
| Site Preparation | 3/12/2015 | 3/13/2015 | 3/13/2015 9:26:01 AM | A | PASS |
|
|
Troy Phone #: ###-#### Permit Posted on front doors, but will be moved to a post in front of the Bomb Shelter. Met with Troy to discuss location to place silt fence along curling Dr. will be done today
|
ESC14-00914
| Aging Inspection | 3/13/2015 | 3/13/2015 | 3/13/2015 8:39:00 AM | | PASS |
|
|
|
ESC14-00914
| DOC - Permit Finaled | 3/13/2015 | 3/13/2015 | 3/13/2015 8:38:48 AM | P | PASS |
|
|
Complete no esc issues
|
ESC14-00328
| General Inspection | 3/13/2015 | 3/13/2015 | 3/13/2015 8:23:45 AM | | PASS |
|
|
No activity stockpiles still onsite
|