PLM17-02763
| PLM-Aging Inspection | 3/13/2018 | 3/13/2018 | 3/14/2018 2:29:28 PM | | PEND |
|
|
Spoke with Jenny. She is checking on status
|
PLM18-00553
| Plumbing Rough-in | 3/12/2018 | 3/13/2018 | 3/13/2018 4:25:55 PM | P | PASS |
|
|
JOB # 51284 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM18-00554
| Plumbing Rough-in | 3/12/2018 | 3/13/2018 | 3/13/2018 4:25:26 PM | P | PASS |
|
|
JOB # 51285 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM18-00862
| Plumbing Rough-in | 3/13/2018 | 3/13/2018 | 3/13/2018 2:26:38 PM | P | PASS |
|
|
Please call homeowner 30 minutes in advance for access at ###-#### and call Eddie with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs
|
PLM18-01015
| Plumbing Rough-in | 3/12/2018 | 3/13/2018 | 3/13/2018 1:52:04 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Troy Pherigo
|
PLM18-01016
| Water and/or Sewer | 3/13/2018 | 3/13/2018 | 3/13/2018 1:17:59 PM | P | PASS |
|
|
Water only ran from water meter set to under footing at builnding. Phone #: ###-#### Inspection requested via web by Jacob Wilcox. To be backfilled with sand.
|
PLM18-01016
| DOC - Permit Finaled | 3/13/2018 | 3/13/2018 | 3/13/2018 1:17:29 PM | P | PASS |
|
|
water line to be backfilled with sand
|
PLM17-03804
| Final | 3/12/2018 | 3/13/2018 | 3/13/2018 10:53:57 AM | A | FAIL |
|
|
Kevin Phone #: ###-####. The water heater drain pan isn't large enough to meet the manufacturers installation instructions. Seal the shower valve trims
|
PLM18-00989
| Water Heater Final | 3/12/2018 | 3/13/2018 | 3/13/2018 10:28:10 AM | A | PASS |
|
|
###-#### Phone #: ###-#### Inspection requested via web by curtis rowe. Verified co detectors and Air vents are being added to wh door per Curtis
|
PLM18-00480
| Water and/or Sewer | 3/12/2018 | 3/13/2018 | 3/13/2018 10:19:11 AM | A | PASS |
|
|
Randall Phone #: ###-####
|
PLM18-00480
| DOC - Permit Finaled | 3/13/2018 | 3/13/2018 | 3/13/2018 10:18:57 AM | P | PASS |
|
|
trailer hu
|
PLM18-00479
| Water and/or Sewer | 3/12/2018 | 3/13/2018 | 3/13/2018 10:05:33 AM | A | CANC |
|
|
Randall Phone #: ###-#### trailer hu
|
PLM18-00479
| DOC - Permit Finaled | 3/13/2018 | 3/13/2018 | 3/13/2018 10:05:15 AM | P | PASS |
|
|
|
PLM18-00927
| Plumbing Rough-in | 3/12/2018 | 3/13/2018 | 3/13/2018 9:31:05 AM | A | PART |
|
|
GW/Rough-In waste/water, if questions call Efrain @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann. GW ok to cover. Hand sinks and coffee ok to cover #18 #28.
|
PLM18-00674
| Water and/or Sewer | 3/12/2018 | 3/13/2018 | 3/13/2018 9:03:32 AM | A | PASS |
|
|
the line is full of water. Fittings have been changed out. Phone #: ###-#### Inspection requested via web by David Snow
|
PLM18-00674
| DOC - Permit Finaled | 3/13/2018 | 3/13/2018 | 3/13/2018 9:03:16 AM | P | PASS |
|
|
sewer invert is approx. 2 feet deep
|
MIS18-00086
| PLM-Conference | 3/13/2018 | 3/13/2018 | 3/13/2018 8:41:47 AM | A | PASS |
|
|
plm conference. Met with Nels Moore. The 4" drain only extends half way down the building and doesn't have grade to make it to the proposed rr's. There is an existing duplex ejector 150 feet (approx) upstream. The best solution would be to add a second duplex ejector for the proposed rr's and tie into the existing 4" overhead drain. The 4" overhead drains by gravity to the underground horizontal.
|
PLM18-00993
| Groundwork | 3/12/2018 | 3/13/2018 | 3/13/2018 8:38:26 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John Simpson
|
PLM17-05032
| Groundwork | 3/12/2018 | 3/13/2018 | 3/12/2018 10:56:05 AM | A | PASS |
|
|
DAVIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Completes hair trap line, North end building
|