ELE16-00910
| ELE-Aging Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 3:05:19 PM | | FAIL |
|
|
homeowner been notified
|
ELE17-01002
| ELE-Aging Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 3:04:40 PM | | DONE |
|
|
still under construction
|
ELE20-00886
| Electrical Rough-In | 3/12/2020 | 3/13/2020 | 3/13/2020 3:03:55 PM | P | CANC |
|
|
Please call 30 mins prior as electrician is not on site Phone #: ###-#### Inspection requested via web by Kerri Hamilton...needed conference...wiring not yet complete
|
ELE20-00886
| Conference | 3/13/2020 | 3/13/2020 | 3/13/2020 3:03:19 PM | P | PASS |
|
|
Please call 30 mins prior as electrician is not on site Phone #: ###-#### Inspection requested via web by Kerri Hamilton...discussed wiring of house...specific layout and SD requirement-hard wire or not-building permit requirement
|
ELE19-03639
| Electrical Rough-In | 3/13/2020 | 3/13/2020 | 3/13/2020 1:58:38 PM | P | PASS |
|
|
rough in for metal furred down ceiling areas in breezeways at ends of breezeways. Phone #: ###-#### Inspection requested via web by Todd Hall...ok to cover
|
ELE20-00668
| Final | 3/13/2020 | 3/13/2020 | 3/13/2020 1:17:14 PM | P | FAIL |
|
|
Contact Julian Lopez (General Contractor) for access. Phone #: ###-#### Inspection requested via web by Scott Campbell... 1) receptacles shall be firmly fastened to wall 2) all receptacles and switches shall have platesinstalled 3) work shall be completed before scheduling final inspections
|
ELE20-00809
| Electrical Rough-In | 3/13/2020 | 3/13/2020 | 3/13/2020 12:23:07 PM | P | PASS |
|
|
Underground Inspection Phone #: ###-#### Inspection requested via web by Steven Ragan... ok to cover...pipe for RV pedestal
|
ELE20-00897
| Permanent Service | 3/13/2020 | 3/13/2020 | 3/13/2020 12:03:18 PM | P | PASS |
|
|
Call ahead 15 mins- Lance Phone #: ###-####... THIS PERMIT NEEDS REFUNDED...ELE20-00869 is permit inspections done under...pulled twice because unsure what needed to do by homeowner
|
ELE20-00869
| Permanent Service | 3/13/2020 | 3/13/2020 | 3/13/2020 11:55:04 AM | P | PASS |
|
|
meter replaced...1st one had issues...2nd replacement.... p/s u/g reconnect ok
|
ELE19-04381
| Final | 3/12/2020 | 3/13/2020 | 3/13/2020 11:14:49 AM | A | PASS |
|
|
call me on way so i can meet to let you in. Phone #: ###-#### Inspection requested via web by Kurtis Moore...ok to final
|
ELE20-00449
| Electrical Rough-In | 3/12/2020 | 3/13/2020 | 3/13/2020 10:16:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...remaining walls of phase 1 ok to cover...plans marked
|
ELE19-04918
| Electrical Rough-In | 3/12/2020 | 3/13/2020 | 3/13/2020 9:45:05 AM | A | PASS |
|
|
South tower 12 units ceiling drops Phone #: ###-#### Inspection requested via web by Todd Hall...ok to cover
|
ELE20-00481
| Final | 3/13/2020 | 3/13/2020 | 3/13/2020 9:16:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bayley Beard..few corrections made...outside canopy complete-disconnect and surface wiring for lights...ok to final
|
ELE19-04125
| Final | 3/12/2020 | 3/13/2020 | 3/13/2020 8:48:46 AM | A | PASS |
|
|
Code for door is 2020 Phone #: ###-#### Inspection requested via web by David Kubik... corrections made...ok to final
|
MIS20-00041
| Set Bond Amount | 2/28/2020 | 3/13/2020 | 3/13/2020 7:40:02 AM | A | CANC |
|
|
check for permits...given more than 30 days...wrong inspection
|
ELE20-00869
| Final | 3/12/2020 | 3/13/2020 | 3/13/2020 7:30:16 AM | A | PASS |
|
|
Lance Phone #: ###-####...finaled previous day
|