BLD19-00895
| BLD-Conference | 3/10/2020 | 3/12/2020 | | A | |
|
|
Dan Phone #: ###-####
|
BLD19-02635
| BLD-Final | 3/13/2020 | 3/13/2020 | 3/15/2020 9:01:17 PM | P | PASS |
|
|
Rob Phone #: ###-####
|
BLD19-04362
| BLD-Wall Bracing | 3/13/2020 | 3/13/2020 | 3/15/2020 9:00:05 PM | P | PART |
|
|
shear // Justin Phone #: ###-#### needs letter from engineer on hold downs front window and enstall one in back tv rm
|
BLD19-04362
| BLD-Framing/Rough-in | 3/13/2020 | 3/13/2020 | 3/15/2020 8:58:28 PM | P | PART |
|
|
Justin Phone #: ###-#### needs fire blocking tv room ok to insulate
|
BLD19-03290
| DOC - Permit Finaled | 3/13/2020 | 3/13/2020 | 3/13/2020 2:59:42 PM | P | PASS |
|
|
|
BLD19-03683
| BLD-Ceiling Grid Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 2:41:38 PM | P | PASS |
|
|
Garrett - please call 20 minutes ahead Phone #: ###-####
|
BLD20-00485
| BLD-Framing/Rough-in | 3/12/2020 | 3/13/2020 | 3/13/2020 11:13:35 AM | A | PASS |
|
|
call for access // Jan Phone #: ###-####
|
BLD19-04965
| BLD-Wall Bracing | 3/12/2020 | 3/13/2020 | 3/13/2020 11:13:07 AM | A | PASS |
|
|
shear // James Phone #: ###-####
|
BLD20-00239
| BLD-Framing/Rough-in | 3/12/2020 | 3/13/2020 | 3/13/2020 10:41:21 AM | A | PASS |
|
|
Jeremy Phone #: ###-####
|
BLD20-00239
| BLD-Energy code compliance | 3/13/2020 | 3/13/2020 | 3/13/2020 10:41:08 AM | A | PASS |
|
|
|
BLD19-03112
| BLD-Footing | 3/12/2020 | 3/13/2020 | 3/13/2020 10:39:41 AM | A | PASS |
|
|
Chris Phone #: ###-####
|
BLD20-00631
| BLD-Footing | 3/12/2020 | 3/13/2020 | 3/13/2020 9:55:49 AM | A | PASS |
|
|
Brian Phone #: ###-####
|
BLD18-03143
| BLD-Framing/Rough-in | 3/13/2020 | 3/13/2020 | 3/13/2020 9:44:19 AM | A | PASS |
|
|
Level 3 and level 4 hotel framing at corridor for cover. Ongoing cover inspections. Call Adam when heading to site. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD20-00602
| BLD-Framing/Rough-in | 3/12/2020 | 3/13/2020 | 3/12/2020 1:57:22 PM | P | PASS |
|
|
Keith Phone #: ###-####
|