PLM96-00233
| INSP - Final | 3/13/1996 | 3/14/1996 | 3/14/1996 12:00:00 AM | A | NR |
|
|
03/13/96 330 -
|
PLM96-00499
| INSP - Plumbing Rough-in | 3/14/1996 | 3/14/1996 | 3/14/1996 12:00:00 AM | P | PASS |
|
|
03/14/96 330 - basic 9 fixtures this will be ready at 2:00
|
PLM96-00504
| INSP - Sprinkler & Backflow | 3/14/1996 | 3/14/1996 | 3/14/1996 12:00:00 AM | P | FAIL |
|
|
03/14/96 330 - not tested connections covered
|