BLD00-00500
| BLD-Foundation | 3/13/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 16:34:42. Contact: ###-####.
|
BLD00-00456
| BLD-Foundation | 3/13/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 16:35:46. Contact: ###-####.
|
BLD99-03572
| BLD-Framing/Rough-in | 3/13/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 11:28:55. Contact: ###-####. Truss eng. not on site- 4x8 missing- cantilever BCI's?? Did not crawl inspection terminated. 3/14/00 1:59:17 PM
|
BLD99-02099
| BLD-Final | 3/13/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 11:29:44. Contact: ###-####. Not ready. 3/16/00 11:28:48 AM
|
BLD00-00190
| BLD-Framing/Rough-in | 3/13/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 13:15:48. Contact: ###-####. Electrical RED TAG 3/10/00; Reinspection fee due $42.00 3/14/00 1:57:04 PM
|
BLD99-01135
| BLD-Final | 3/13/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | A | FAIL |
|
|
###-#### Need other finals. 3/14/00 1:57:29 PM
|
BLD00-00482
| BLD-Footing | 3/13/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | A | FAIL |
|
|
###-#### Not ready- No bds., rebar, etc. 3/14/00 1:59:31 PM
|
BLD99-02462
| BLD-Framing/Rough-in | 3/10/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/10/2000 at 12:09:23. Contact: ###-####. please do first thing Shear inspection only- no truss engineering- shear ok. 3/16/00 11:28:38 AM
|
BLD99-03242
| BLD-Framing/Rough-in | 3/13/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 11:17:32. Contact: ###-####. Called to reschedule- ran out of time 3/16/00 11:28:07 AM
|
BLD99-03348
| BLD-Footing | 3/13/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 16:26:27. Contact: ###-####. East elevation done & south elevation ok from 85 to 120 on Gride 5.6 than Grid C from 4.6 to 5.6 3/16/00 11:25:33 AM
|
BLD99-03627
| BLD-Framing/Rough-in | 3/13/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 20:21:24. Contact: ###-####. Infiltration package & plumbing insp. not done. 3/16/00 11:27:37 AM
|
BLD00-00448
| BLD-Footing | 3/14/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/14/2000 at 06:42:20. Contact: ###-####. Russ said ok according to concrete contractor- Russ is to sign off as Russ told me it was failed. 3/16/00 11:26:51 AM
|
BLD97-03080
| BLD-Framing/Rough-in | 3/14/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | P | PASS |
|
|
steve---###-#### fr
|
BLD00-00482
| BLD-Foundation | 3/14/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-00520
| BLD-Footing | 3/14/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/14/2000 at 10:35:04. Contact: ###-####. Not ready- home laid out wrong. 3/16/00 11:26:02 AM
|
BLD00-00333
| BLD-Framing/Rough-in | 3/14/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | P | FAIL |
|
|
john ###-#### shear nail insp Unable to make 2nd trip- called to reschedule. 3/16/00 11:27:08 AM
|
BLD00-00088
| BLD-Framing/Rough-in | 3/14/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/14/2000 at 11:19:57. Contact: .
|