Inspections for the day of: Tuesday, March 14, 2000.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWes Worcester
TitleBLD-COM/RES INSPECTOR
Phone #340-1490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00500 BLD-Foundation3/13/20003/14/20003/14/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/13/2000 at 16:34:42. Contact: ###-####.
BLD00-00456 BLD-Foundation3/13/20003/14/20003/14/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/13/2000 at 16:35:46. Contact: ###-####.
BLD99-03572 BLD-Framing/Rough-in3/13/20003/14/20003/14/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/13/2000 at 11:28:55. Contact: ###-####. Truss eng. not on site- 4x8 missing- cantilever BCI's?? Did not crawl inspection terminated. 3/14/00 1:59:17 PM
BLD99-02099 BLD-Final3/13/20003/14/20003/14/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/13/2000 at 11:29:44. Contact: ###-####. Not ready. 3/16/00 11:28:48 AM
BLD00-00190 BLD-Framing/Rough-in3/13/20003/14/20003/14/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/13/2000 at 13:15:48. Contact: ###-####. Electrical RED TAG 3/10/00; Reinspection fee due $42.00 3/14/00 1:57:04 PM
BLD99-01135 BLD-Final3/13/20003/14/20003/14/2000 12:00:00 AMAFAIL
###-#### Need other finals. 3/14/00 1:57:29 PM
BLD00-00482 BLD-Footing3/13/20003/14/20003/14/2000 12:00:00 AMAFAIL
###-#### Not ready- No bds., rebar, etc. 3/14/00 1:59:31 PM
BLD99-02462 BLD-Framing/Rough-in3/10/20003/14/20003/14/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/10/2000 at 12:09:23. Contact: ###-####. please do first thing Shear inspection only- no truss engineering- shear ok. 3/16/00 11:28:38 AM
BLD99-03242 BLD-Framing/Rough-in3/13/20003/14/20003/14/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/13/2000 at 11:17:32. Contact: ###-####. Called to reschedule- ran out of time 3/16/00 11:28:07 AM
BLD99-03348 BLD-Footing3/13/20003/14/20003/14/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/13/2000 at 16:26:27. Contact: ###-####. East elevation done & south elevation ok from 85 to 120 on Gride 5.6 than Grid C from 4.6 to 5.6 3/16/00 11:25:33 AM
BLD99-03627 BLD-Framing/Rough-in3/13/20003/14/20003/14/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/13/2000 at 20:21:24. Contact: ###-####. Infiltration package & plumbing insp. not done. 3/16/00 11:27:37 AM
BLD00-00448 BLD-Footing3/14/20003/14/20003/14/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/14/2000 at 06:42:20. Contact: ###-####. Russ said ok according to concrete contractor- Russ is to sign off as Russ told me it was failed. 3/16/00 11:26:51 AM
BLD97-03080 BLD-Framing/Rough-in3/14/20003/14/20003/14/2000 12:00:00 AMPPASS
steve---###-#### fr
BLD00-00482 BLD-Foundation3/14/20003/14/20003/14/2000 12:00:00 AMPPASS
###-####
BLD00-00520 BLD-Footing3/14/20003/14/20003/14/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/14/2000 at 10:35:04. Contact: ###-####. Not ready- home laid out wrong. 3/16/00 11:26:02 AM
BLD00-00333 BLD-Framing/Rough-in3/14/20003/14/20003/14/2000 12:00:00 AMPFAIL
john ###-#### shear nail insp Unable to make 2nd trip- called to reschedule. 3/16/00 11:27:08 AM
BLD00-00088 BLD-Framing/Rough-in3/14/20003/14/20003/14/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/14/2000 at 11:19:57. Contact: .