BLD99-00962
| FIRE-Final Inspection | 3/14/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/14/2000 at 06:50:52. Contact: ###-####.
|
FIR00-00015
| INSP-Supply line flush | 3/14/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | A | PASS |
|
|
|
BLD99-02620
| FIRE-Final Inspection | 3/14/2000 | 3/14/2000 | 3/14/2000 12:00:00 AM | P | PASS |
|
|
received letter from engineer stating the design cfm for the kitchen exhaust is changed to 3400 cfm. letter sent to the FD.
|