BLD00-01050
| FIRE-Final Inspection | 3/13/2001 | 3/14/2001 | 3/14/2001 12:00:00 AM | A | PART |
|
|
Conf with contr reg Bldg #5 temp occ 3/14/2001 12:31:48 PM
|
FIR01-00058
| INSP-Supply line flush | 3/13/2001 | 3/14/2001 | 3/14/2001 12:00:00 AM | A | PART |
|
|
OK to cover under slab mains on Bldg #1 3/15/2001 8:15:26 AM
|
BLD00-02434
| FIRE-Final Inspection | 3/13/2001 | 3/14/2001 | 3/14/2001 12:00:00 AM | A | FAIL |
|
|
fire fn bill ###-#### Reinsp Fail C/N not done 3/14/2001 12:30:43 PM
|
BLD00-03372
| FIRE-Sprinkler Rough-in | 3/13/2001 | 3/14/2001 | 3/14/2001 12:00:00 AM | A | FAIL |
|
|
###-#### Reinsp Fail Doors not latching 3/14/2001 12:32:29 PM
|
BLD00-02420
| FIRE-Final Inspection | 3/14/2001 | 3/14/2001 | 3/14/2001 12:00:00 AM | P | FAIL |
|
|
Final Fail C/N issued 3/15/2001 8:15:59 AM
|
BLD01-00425
| FIRE-Final Inspection | 3/14/2001 | 3/14/2001 | 3/14/2001 12:00:00 AM | P | FAIL |
|
|
Final Fail Spklr coverage 3/15/2001 8:16:35 AM
|