BLD00-03025
| BLD-Framing/Rough-in | 3/13/2001 | 3/14/2001 | 3/14/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/13/2001 at 11:18:49. Contact: ###-####.needs more pods. 3/14/2001 1:23:43 PM
|
BLD00-03451
| BLD-Framing/Rough-in | 3/13/2001 | 3/14/2001 | 3/14/2001 12:00:00 AM | A | FAIL |
|
|
###-#### please call him on your way out. ok to cover east office,west side has rest room which does not comply with size dem on plans. 3/14/2001 1:27:01 PM
|
BLD01-00152
| BLD-Framing/Rough-in | 3/14/2001 | 3/14/2001 | 3/14/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/14/2001 at 09:11:09. Contact: ###-####.c/n posted. 3/14/2001 3:32:44 PM
|
BLD01-00153
| BLD-Footing | 3/14/2001 | 3/14/2001 | 3/14/2001 12:00:00 AM | P | PART |
|
|
FT INSP--JACK ###-####ok except rebar not in place at garage. 3/14/2001 4:40:21 PM
|
BLD01-00095
| BLD-Wall cover | 3/13/2001 | 3/14/2001 | 3/14/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 03/13/2001 at 13:11:29. Contact: ###-####.
|
BLD00-03244
| BLD-Final | 3/13/2001 | 3/14/2001 | 3/14/2001 12:00:00 AM | P | FAIL |
|
|
###-#### called contractor left message to call me back,owner had phoned in inspection,need to talk with contractor about installer certification,grade . 3/14/2001 4:43:09 PM 3/14/2001 4:43:47 PM
|
BLD00-01531
| BLD-Footing | 3/13/2001 | 3/14/2001 | 3/14/2001 12:00:00 AM | P | PART |
|
|
###-#### WILL POUR AT 1:30subject to s-i. 3/14/2001 4:10:12 PM
|